Laserfiche WebLink
, . <br /> 99 106375 <br /> Tenant within ten (10) days thereafter. After the lowest acceptable bid has been determined, <br /> Landlord and Tenant shall approve or disapprove the bid. Within ten (10) days after such <br /> approval, Landlord shall enter into a contract with the approv�d bidder ("Site Gontractor") for <br /> performance of the Phase 1 Site Work, unless some reason for disqualification has occurred. <br /> Landlord shall provide Tenant with a copy of its contract ("Site Contract") with the Site <br /> Contractor. Landlord shall cause the Phase 1 Site Work to be performed in accordance with the <br /> Construction Documents pertaining thereto, and with the requirements of all governmental <br /> bodies having jurisdiction, subject to all rights of reimbursement, collection and contribution set <br /> forth in Article 9 (Payment of Costs) of this Development Agreement. <br /> 6.2 If Landlord or Tenant does not approve the bid for any Phase 1 Site Work <br /> to which Tenant is required to contribute, Landlord, Tenant and the Project Architect shall work <br /> together to reduce the cost with, if requested by either Landlord or Tenant, the work being rebid <br /> in the manner set forth above. <br /> 6.3 The bidding package for the Phase 1 Site Work shall be limited to only the <br /> Site Work to be performed in conjunction with development of Phase 1 (including those items <br /> listed on Exhibit "D"), with other work, if any, for which Tenant is not to pay Landlord a portion <br /> thereof being bid separate and apart from the Phase 1 Site Work. <br /> 6.4 The construction of all buildings and Common Area improvements <br /> described in this Development Agreement for any Phase (including, without limitation, the <br /> completion of construction of Landlord's Building referenced in Section 3.1 of this Development <br /> Agreement) shall be conducted in such a manner as to minimize interference with access to <br /> Tenant's Building and Landlord's Building from any public right-of-way by Tenant or Landlord, <br /> their agents, contractors, subcontractors or employees. Staging for the construction or <br /> completion of construction of any buildings described in Article 3 (Construction by Landlord) of <br /> this Development Agreement including, without limitation, the location of any temporary <br /> buildings or construction sheds/trailers, the storage of building materials, and the parking of <br /> construction vehicles and equipment shall be restricted to that portion of the Shopping Center <br /> approved in writing by Tenant, which approval shall not be unreasonably withheld or delayed. <br /> 7. Force Majeure. <br /> 7.1 Landlord and Tenant will each comply with the time periods set forth in <br /> Articles 2 (Construction by Tenant) , 3 (Construction by Landlord), and 3A (Development of <br /> Phase 2) of this Development Agreement; provided, however, that said periods shall be extended <br /> for a period or periods of time equal to any period or periods of delay caused by strikes, lockouts, <br /> fire or other casualty, the elements or acts of God, refusal or failure of governmental authorities <br /> to grant necessary permits and approvals for the construction of the buildings contemplated <br /> 9 <br />