Laserfiche WebLink
. <br /> 99 10 � 375 <br /> property line of the Shopping Center to the individual building pads of the parties. The final <br /> hook-up of building utilities including meters and all associated utility connection fees shall be <br /> the responsibility of Tenant (as to Tenant's Building) and Landlord (as to all other buildings in <br /> the Shopping Center). The utilities shall be brought to within five (5) feet of each building pad at <br /> a location designated by Tenant (as to Tenant's Building) and Landlord (as to all other buildings <br /> in the Shopping Center). The on-site work to be performed in conjunction with the Phase 1 Site <br /> Work, as listed on Exhibit "D," shall be commenced within ten (10) days after the contract for <br /> the construction thereof has been signed and shall be completed within one hundred twenty (120) <br /> days from the date construction thereof is commenced or at least thirty (30) days prior to the date <br /> Tenant plans to commence construction of Tenant's Building, whichever last occurs. <br /> 5.6 The finished Common Area work shall include the construction and <br /> installation of the Center Pylon Sign structures which are within the Phase being constructed; <br /> fine grading and base; perimeter and retaining walls (if required); Common Area paving, <br /> striping, lighting, landscaping (including all associated irrigation lines and appurtenances); <br /> bumpers, curbs, gutters, storm drains and sewers, sidewalks (except sidewalks immediately <br /> adjacent to buildings); and the installation of all other Common Area utilities (including <br /> electrical hookup of the Center Pylon Sign to the Common Area meter). Except as otherwise set <br /> forth in Section 3.2 of this Development Agreement, the finished Common Area work to be done <br /> in conjunction with the Phase 1 Site Work shall be completed at least thirty (30) days prior to the <br /> date Tenant plans to first open Tenant's Building for business. <br /> 5.7 For purposes of the Phase 1 Site Work , in the event of a conflict between <br /> the requirements of the definition of "Site Work" set forth above, and the requirements of <br /> Exhibit "D," Exhibit "D" shall control. For purposes of Phase 2, the definition of "Site Work" <br /> shall be controlling. <br /> 5.8 The Site Work for either Phase shall not include the construction of <br /> delivery slabs or Service Facilities for any building in the Shopping Center. <br /> 6. General Contracting. <br /> 6.1 Landlord shall put the Phase 1 Site Work out to open bid to at least four <br /> (4) general contractors concurrent with the bid for Tenant's Building or, if Tenant's Building is <br /> not put out to open bid, within thirty (30) days after Landlord and Tenant have approved the <br /> Construction Documents for the Phase 1 Site Work. All of the general contractors on the bid list <br /> shall be approved by Landlord and Tenant, which approval shall not be unreasonably withheld or <br /> delayed. All bidders shall be expressly required to list in their respective bids as a bid alternate <br /> (or to otherwise segregate) all of the work related to the construction and installation of the <br /> structures of Center Pylon Signs A and B (excluding electrical hookup to the Common Area <br /> meter). The bids shall be read aloud in a public opening and copies of the bids provided to <br /> 8 <br />