Laserfiche WebLink
Note: Streets Division shall be contacted prior to work <br />beginning at 308-385-5322. Any keyhole potholing <br />locations in the roadway shall be approved by the <br />Streets Division and shall be filled within 5 days of <br />ootholina. <br />Maintain 3' of horizontal separation if paralleing water mains. <br />Maintain 1' of vertical separation at water main crossings. <br />Pull Box 1 - EX Segra Pull Box <br />Splice New Fiber to EX Fiber <br />1 Ea. Splice Enclosure <br />80' of 144 SM (Coil) <br />515' of (2) 1.25" B, 144 SM, TW <br />From Pull Box 1 to Pull Box 2 <br />I MATCH LINE SHEET 5 I <br />775' of (2) 1.25" B, 144 SM, TW <br />From Pull Box 2 to Pull Box 3 <br />Pull Box 2 - New Segra Pull Box <br />1 Ea. Segra Pull Box <br />80' of 144 SM (Coil) <br />PROJECT NO. <br />SHEET NO. <br />SEGRA: P059834 <br />JEO: 251901.10 <br />Date: 22JAN-2026 <br />Drawn: BR8 <br />Chock.: JDH <br />Approved' MAF <br />SEGRA <br />DIAMOND PLASTICS CORP <br />1212 JOHNSTOWN RD <br />GRAND ISLAND, NE <br />0 25 50 <br />Know what's below. <br />Call before you dig. <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC. GAS MAINS, CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />JEO CONSULTING GROUP INC <br />1937 N. Cbesinul Morel <br />WaOPT, NE 68066 <br />1.800.723.8567 <br />JEO ConsuBng Group, Inc. <br />Orgenhallon CBNOcale of Au...Radon <br />Number CA0099 <br />FIBER DESIGN <br />