Laserfiche WebLink
202601609 <br />Note: Streets Division shall be contacted prior to work <br />beginning at 308-385-5322. Any keyhole potholing <br />locations in the roadway shall be approved by the <br />Streets Division and shall be filled within 5 days of <br />potholing. <br />Maintain 3' of horizontal separation if paralleing water mains. <br />Maintain 1' of vertical se•aration at water main crossin•s. <br />PROJECT NO. <br />SHEET NO. <br />SEGRA: P059834 <br />JEO: 251901.10 <br />Date: 22-JAN-2026 <br />Drawn: BRB <br />Checked: JDH <br />Aeorovd' MAF <br />SEGRJ <br />DIAMOND PLASTICS CORP <br />1212 JOHNSTOWN RD <br />GRAND ISLAND, NE <br />0 25 50 <br />Know what's below. <br />Call before you dig. <br />PRIOR TO CONSTRUCTION: <br />CALL 911 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC, GAS MAINS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE. THEIR LOCATIONS MUST <br />RE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />lEO CONSULTING GROUP INC <br />1937 N. Chestnut Street <br />Wauao, NE 88086 <br />1.800.723.8567 <br />JEO Consulting Group, Inc. <br />Organization Ca alcale of AUNONatlon <br />Number: CA0069 <br />FIBER DESIGN <br />