My WebLink
|
Help
|
About
|
Sign Out
Browse
202401629
LFImages
>
Deeds
>
Deeds By Year
>
2024
>
202401629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 9:58:33 AM
Creation date
4/16/2024 9:54:33 AM
Metadata
Fields
Template:
DEEDS
Inst Number
202401629
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
202401629 <br />12.05 Granular Foundation Course. This work shall consist of the construction of a <br />compacted foundation course of granular material to the lines, grade, and dimensions <br />shown on the plans on a previously prepared and approved subgrade. <br />12.06 Surplus Earth. All surplus earth shall be stockpiled by the Contractor at the <br />location or locations designated on the plans or as the Engineer shall direct. <br />12.07 Adjustment of Manholes. All manholes encountered whether shown on the <br />plans or not shall be brought to the proper grade by removing the castings and adjusting <br />the tops of the existing manholes by removal or addition of concrete or brick, as the case <br />may be, and resetting the frames and covers. <br />Brick masonry shall consist of the type of brick satisfactory to the Engineer, <br />laid in 1:2 cement mortar. All brick must be wetted before being laid. All joints shall be <br />completely filled with mortar and shall not be less than 1/4 inch and not more than 1/2 <br />inch in thickness. <br />Contractors are instructed to use plastic or concrete risers to bring manhole <br />ring and covers to grade. Using pieces of wood, concrete or bricks and then filing with <br />concrete mortar will no longer be accepted. <br />All manholes will be inspected before and after a concrete or asphalt street is <br />laid down to insure that no foreign material is in the flow line or at the bottom of a <br />manhole. <br />Revised 1-18-2010 <br />12.08 Adjustment of Storm Sewer Inlets. All storm sewer inlets shall be adjusted to <br />line and grade by removing the castings and adjusting the tops of the existing storm <br />sewer inlets by removing or adding concrete or bricks, as the case may be, and resetting <br />the castings. <br />Brick masonry shall consist of the type of brick satisfactory to the Engineer, <br />laid in 1:2 cement mortar. All brick must be wetted before being laid. All joints shall be <br />completely filled with mortar and shall not be less than 1/4 inch and not more than 1/2 <br />inch in thickness. <br />12.09 Integral Curb. Integral curb shall be constructed on the edge of the concrete <br />slab in accordance with the plans and typical cross section. This curb shall be placed <br />immediately after the concrete on the pavement has been placed and finished and <br />before it takes its initial set. That part of the pavement which is to be covered by the <br />integral curb shall be cleaned of all laitance and shall be roughened. Integral Curb will <br />be required on all new pavement construction. If construction is a very short section, the <br />Director of Public Works may allow an exception upon written request. <br />2-4 <br />Page 12 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.