Laserfiche WebLink
Bend Road for the detour while they fix the bridge. They are considering tubes or a box <br /> culvert. <br /> They are currently working on Project 573. They have 2 crews removing trees on <br /> Denman Road from the storm. They are getting them off the roads and cleaning up the <br /> ditches and hauling it away. He noted that there were some signs that were flattened so <br /> they were repaired. He also noted that there was a complaint on a bridge and they cut <br /> the approach down to address the problem. <br /> Quandt ask about the potholes on Schultz Road if they had been patched. He also ask <br /> about the fences and Don said that is a winter project and they will continue to get the <br /> fences out of the Right of Way. <br /> Lancaster also ask about the potholes told the person to call the road department She <br /> ask that Don check on it. <br /> Don reported that they will remove a section of road where they will be running the <br /> marathon. The tree roots have pushed up the road and the only way to fix it is to cut the <br /> roots and repave it. <br /> 6A COUNTY ATTORNEY— a) DISCUSSION & POSSIBLE ACTION REGARDING THE <br /> APPOINTMENT TO REPLACE TWO VACANCIES ON THE HALL COUNTY WEED <br /> BOARD — Weed Superintendent Rob Schultz was present and said they have 2 <br /> vacancies that need to be filled 1 inside the city limits and outside the city limits. There <br /> are currently 2 applications for inside the city limits and Rob said they do have 1 person <br /> interested and they are talking to him. They will have to file by July 15 for the general <br /> election. <br /> Sorensen ask to add weed board interviews to the June 30, 2026, agenda. <br /> 8.FACILITIES — DISUSSION & POSSIBLE ACTION REGARDING HALL COUNTY <br /> ATTORNEY -BUILDING — Loren Humphrey explained the problems with the attorney <br /> building. This addressed the fan coils in each room and the pipes that drain to the <br /> center of the building. The pipes are galvanized steel and there is condensation on the <br /> pipes and some of the pipes have rusted shut so they will no longer drain. It causes <br /> humidity in the building, and the pipes are leaking on the ceiling tile. Some of the <br /> insulation had to be removed and they had to repair pipes that were leaking. It has also <br /> caused mold in the building. <br /> There are 3 options to make the repairs. <br /> • Continue as they are with the fans in the ceilings and wait until fall to make the <br /> repairs when they shut down the air conditioning. <br /> • Empty out the building, relocate the staff remove all the ceilings and make the <br /> repairs all at once <br /> • Shut down part of the building and relocate people, make the repairs on part of it <br /> and then move staff back and work on the other side. <br /> 4 <br />