My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/2019
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2019
>
12/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 1:48:29 PM
Creation date
1/31/2020 1:48:09 PM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Term—This permit is intended to substantially coincide with Smart Soil LLC's Nebraska Department <br /> of Environment and Energy Operating Permit, but shall expire no later than December 31, 2026. <br /> The permit may be terminated if Applicant fails to comply with any of the conditions set forth herein. <br /> In the event of noncompliance,the Hall County Board of Supervisors shall notify Applicant in writing <br /> setting forth the areas of noncompliance. If Applicant fails to cure said noncompliance to the <br /> satisfaction of the Board within thirty(30)days after receiving said notice, the Hall County Board of <br /> Supervisors may suspend,revoke, or terminate this conditional use permit. In addition, the county <br /> may institute any appropriate action or proceeding to prevent, restrain, correct, or abate any breach, <br /> violation, or noncompliance. The remedies stated above are cumulative and in addition to any other <br /> remedies provided by law. <br /> Water and Regulatory Conditions: <br /> Applicant will comply with Nebraska Department of Environment and Energy(NDEE)rules, <br /> regulations, and conditions. Applicant will provide copies, within 30 days of receipt, of all <br /> construction and operating permits issued by NDEE to zoning officials. Applicant will provide any <br /> additional NDEE and zoning documentation upon request. <br /> Applicant will follow all Federal, State, County, and local laws, codes, and regulations. <br /> Applicant shall contain all water that that falls within the compost facility and maintain separation of <br /> such water from waters leaving the site via natural water ways. <br /> Applicant shall maintain natural drainage to and from the site at pre-development quantity and in <br /> substantially the same location. <br /> General Operating Conditions: <br /> Applicant may operate the site 7 days a week. <br /> Applicant shall not accept materials on Sundays, but may accept materials on any other day. <br /> Applicant will maintain the facility in a clean,neat, and orderly condition. <br /> Applicant shall not turn the compost materials on Saturdays, Sundays, and County Holidays from <br /> May 1 through October 1 of each year. <br /> Material Composition&Incorporation Conditions: <br /> Applicant shall limit composting to the Initial List of Components to be composted at the site for the <br /> first six months of operation to establish a baseline for odor control, fly control and traffic. Upon <br /> successful completion of the six month period and establishment of baseline expectations the <br /> applicant may add additional component by reporting the addition of those components to the zoning <br /> official and beginning a new six month control period to determine the impact on odor control, fly <br /> control and traffic generated. <br /> Initial list of components to be composted at the site. <br /> Nitrogen-Based Sources <br /> Paunch-must have blood, grease and meats virtually eliminated <br /> Grit- included with the paunch(a mixture of sand and manure from the kill floor) <br /> Waste Activated Sludge-residual,semi-solid material that is produced as a by-product during <br /> sewage treatment of industrial or municipal wastewater <br /> Bio Solids -the nutrient-rich organic materials resulting from the treatment of domestic <br /> sewage in a wastewater treatment <br /> Smart Soil LLC—Conditional Use Permit- Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.