My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2019
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2019
>
08/20/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 2:45:54 PM
Creation date
1/30/2020 3:29:30 PM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that the same does not constitute a nuisance to or a danger to the life or property of any <br /> person or the public. <br /> 2. Noxious Weeds. Noxious weeds on the premises shall be controlled pursuant to state <br /> and local laws and regulations. <br /> 3. FAA and FCC Compliance. Applicant shall comply with all applicable rules and <br /> regulations of the Federal Aviation Administration regarding the construction, height, <br /> design and maintenance of the communication tower placed upon the above-described <br /> property and applicable rules of the Federal Communications Commission regarding the <br /> use of the tower and antennas. <br /> 4. Tower Use. Said tower shall be used for communication purposes only. <br /> 5. Conditional Use Standards. Said towers, telecommunications facilities and <br /> antennas shall be developed, designed, constructed, maintained and operated so as to <br /> conform with Applicant's application for Conditional Use, the Hall County Zoning <br /> Resolution, applicable federal and state law and regulations, and applicable American <br /> National Standards Institute(ANSI) standards. In the event of a conflict, the Hall County <br /> Zoning Resolution, applicable federal and state law and regulations, and applicable <br /> American National Standards Institute (ANSI) standards shall govern and control over <br /> Applicant's application. Upon completion of construction of a tower and prior to the <br /> commencement of use, an engineer's certification that the tower is structurally sound and <br /> in conformance with all of the aforementioned applicable regulatory standards shall be <br /> filed with the Building Department. <br /> 6. Co-location of Antennas. The tower shall be designed and constructed so as to <br /> permit co-location of additional antennas as are technologically and logistically feasible. <br /> 7. Co-location of Emergency Service Antennas. The Applicant shall permit <br /> co-location of County emergency service antennas as provided in the County Zoning <br /> Resolution. <br /> 8. Setback. The tower shall meet applicable setbacks as provided in the County Zoning <br /> Resolution and as directed by the County Zoning Director. <br /> 9. Lighting. The tower shall not be artificially lighted unless required by the Federal <br /> Aviation Administration. <br /> 10. Security. The tower shall be enclosed within a security fence or other structure <br /> designed to preclude unauthorized access or shall be designed and constructed in a manner <br /> which will preclude to the extent practical, unauthorized climbing of said structure. <br /> 11. Signs. Except as required by state or federal law or regulations, no signs shall be <br /> allowed on any antenna or tower. <br /> 12. Inspection. The County reserves the right to conduct an inspection of towers, <br /> antenna support structures, telecommunications facilities and antennas upon reasonable <br /> notice to the Applicant or operator to determine compliance with county resolutions and <br /> codes and to prevent structural and equipment failures and accidents which may cause <br /> damage, injuries or nuisances to the public. Inspections may be made to determine <br /> compliance with the Hall County Zoning Resolution, federal and state law or regulations, <br /> or applicable ANSI standards. <br /> 13. Abandonment. If the tower shall cease to be used for a period of three hundred <br /> sixty-five (365) consecutive days, the Zoning Department shall notify the Applicant that <br /> the site will be subject to a determination by the Zoning Department Director that the site <br /> has been abandoned. Upon issuance of a Notice to Show Cause by the Zoning <br />
The URL can be used to link to this page
Your browser does not support the video tag.