My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 6:24:11 PM
Creation date
2/11/2019 8:50:53 AM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALL COUNTY PUBLIC WORKS DEPARTMENT <br /> ttaG. ∎`1� 2900 WEST 2nd ST, GRAND ISLAND, NE 68803-5263 <br /> 11.1' ne 'i% www.hallcountyne.gov <br /> PHONE: (308) 385-5126 FAX: (308) 381-6486 <br /> f, M `/It< w 1 <br /> Steven P.Riehle,P.E. <br /> County Engineer/Highway Superintendent <br /> stever @halleountyne.gov <br /> tyro` ..............� <br /> .-. <br /> November 9, 2018 <br /> Summary of County Board Agenda Item <br /> Discussion and consideration of approval of change order number 2 for the 2018 Hall <br /> County Administration Building Parking Lot Replacement project to pave an entrance <br /> driveway to the Early Voting Drop Off Box. <br /> Background <br /> The bids for the parking lot replacement project were opened on August 21, 2018 and a <br /> contract awarded to Bigzby's, Inc. of Grand Island. <br /> Change order Number 1 to reduce the island width in the parking lot and pave it with colored <br /> stamped concrete median surfacing was approved by the county board on October 2, 2018. <br /> Discussion <br /> The Early Voting Drop Box was placed along the east wall of the Hall County Facilities Building <br /> in advance of the parking lot replacement project. The location for the drop box has worked well <br /> with good visibility for cameras to monitor the drop box. Over 20% of the early ballots came back <br /> via the drop box and that percentage is expected to increase. We are asking the county board <br /> discuss and approve a change order to: <br /> • Leave existing driveway in between the sidewalk and the curb, <br /> • Put in some paving under the current project to serve the drop off box, and <br /> • Put colored stamped concrete in between the new parking lot and proposed driveway <br /> where it would be hard to maintain a narrow strip of sod. <br /> The sketch attached to the change order shows the proposed drive and stamped concrete. <br /> Recommendation <br /> Discuss and approve change order number 2. <br /> Lriette.41 Pah <br /> Steven P. Riehle <br /> Hall County Engineer/Highway Superintendent <br /> CC: Tracy Overstreet, Election Commissioner <br /> Doone Humphrey, Building and Grounds <br /> Attachments: Change Order Number 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.