My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
10/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 6:26:42 PM
Creation date
2/8/2019 10:07:43 AM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
per-. .aaaax <br /> HALL COUNTY PUBLIC WORKS DEPARTMENT <br /> f Fti i. j j +r 2900 WEST 2nd ST, GRAND ISLAND, NE 68803-5263 <br /> www.hallcountyne.gov <br /> z r` PHONE: (308) 385-5126 FAX (308) 381-6486 <br /> r 1/ftt r <br /> Steven P.Riehle,P.E. <br /> County Engineer/Highway Superintendent <br /> o:''-� stever @hallcountyne.gov <br /> •1\:150 R <br /> September 28, 2018 <br /> Summary of County Board Agenda Item <br /> Discussion and consideration of approval of change order number 1 for the Fall 2018 <br /> Asphaltic Concrete Resurfacing. <br /> Background <br /> The bids for the fall 2018 resurfacing were opened on August 21, 2018. The contract was <br /> awarded at the September 4, 2018 board meeting to J.I.L. Asphalt Paving Co. as the low <br /> bidder with all projects tied. The bid award was made with the understanding that a change <br /> order would be brought forward at a future board meeting that: <br /> 1. Extended the project completion date by 2 weeks. <br /> 2. Substituted "SPR Fine" asphaltic concrete for the "LC" mix that was bid for the project on <br /> Hillside Drive east of NE Hwy 11 in Cairo. <br /> Discussion <br /> The project completion is being extended 2 weeks because the contract award was delayed to <br /> 2 weeks after the bid opening. <br /> The "SPR Fine" asphaltic concrete mix design will reduce the cost of the resurfacing on Hillside <br /> Drive by almost $10,000 and is considered a comparable mix. <br /> Recommendation <br /> Approve the change order. <br /> (, a tPgAjt.. <br /> Steven P. Riehle <br /> Hall County Engineer/ Highway Superintendent <br /> Attachments: Change Order Number 1 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.