My WebLink
|
Help
|
About
|
Sign Out
Browse
81005296
LFImages
>
Deeds
>
Deeds By Year
>
1981
>
81005296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2010 9:40:07 PM
Creation date
1/14/2010 9:39:48 PM
Metadata
Fields
Template:
DEEDS
Inst Number
81005296
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t~ag~ i. of 4 <br />Anend lstarsd, 7~ t~9f17 Pitioe+s {~i-2000 <br />* SUH-COIITRACT F.GctEEMENT <br />THIS AGREEMENT, made this 27th day of May , 1R 81, <br />by and hetween SUPRRIOR GLASS <br />hereinafter called "Sub-Contractor", and WHEELER CONSTRUCTION, INC., <br />hereinafter called "Contractor". <br />tdITNESSETfi: That the Sub-Contractor and Contractor, for the <br />considerations hereinafter named, agree as follows: <br />1. Sub-Contractor agrees to furnish all necessary material, <br />tools and incidentals necessary to perform all work and labor <br />as described in Paragr~~h Ma1~eof, for the construction of: <br />for Aon~ie .2anue _ <br />hereinafter called "Owner" at 2540 N. St_ Patrick Ave_ ~ and Gtan3 <br />_n accordance with-the general <br />conditions and special conditions of the contract between the <br />Owner and Contractor, and in accordance with the plans, drawings <br />and specifications prepared by WHEELER CONSTRUCTION, IN~~ <br />hereinafter called "Architect", <br />all of which general conditions, special conditions, plans, draw- <br />ings and specifications signed by the parties thereto or identified <br />by the Architect, form a past of the contract between the Contractor <br />and the Owner dated May 15 19 81 and hereby are <br />made a part of this contract. <br />2. Sub-Contractor and Contractor agree that the materials <br />tc he furnished and work to be done by the Sub-Contractor are as <br />follows: <br />As per plans and attached proposal <br />3, The Sub-Contractor agrees to commence work promptly after <br />receiving written notification by the Contractor that work has <br />progressed to the point that his portion of work may proceed, and <br />further agrees to complete, in a good and workmanlike manner and <br />to the satisfaction of Contractor and the Architect, the several <br />portions and the whole of the work herein sublet within --- <br />days the-~'ea*ter, except as extended by the Contractor. Should "the <br />Sub-Contractor fail to complete work or deliver its material <br />within the time agreed upon, he agrees to pay, and will pay to <br />Contractor for aaeh and every day of such delay beyond the time of <br />completion of work or deliveries of material, the sum of -0- _ <br />Dollars ($ ), <br />w it~i ch sum is hereby, in view of the difficulty of estimating sue <br />
The URL can be used to link to this page
Your browser does not support the video tag.