Laserfiche WebLink
, o <br /> 99 106375 <br /> Work" shall mean the Site Work defined in Article 5 hereof, except that for purposes of this <br /> Section, reference to Phase 2 shall be substituted for the references to Phase 1 or to the Phase 1 <br /> Site Work contained in said Article 5, and the time periods'set forth in the �ast sentences of <br /> Sections 5.4, 5.5, and 5.6 shall not apply. In lieu of the foregoing time periods, all Site Work <br /> relative to Phase 2 shall be required to be completed within a reasonable time after the <br /> commencement thereof. Moreover, Article 6 (General Contracting) and Sections 9.1 through 9.5 <br /> shall not apply to the development of Phase 2. <br /> 3A.4 Incident to the development of Phase 2, the Owner of the property within <br /> Phase 2 shall cooperate with Tenant and its representatives, employees, agents and independent <br /> contractors, to provide Tenant upon request with copies of its construction schedules together <br /> with those portions of the building plans and specifications reasonably required for the <br /> construction or coordination of construction of said Owner's buildings with the Site Work and <br /> other buildings constructed or to be constructed within Phase 1. <br /> 3A.5 Any and all such development work done on Phase 2 now and at any time <br /> hereafter shall be paid for entirely by Landlord, and Tenant shall have no obligation whatsoever <br /> to pay for or in any manner bear any portion of the cost thereof. Landlord hereby <br /> unconditionally agrees to indemnify Tenant and hold it harmless from and against any and all <br /> claims made against Tenant and any and all loss, liability, damage or expense suffered or <br /> incurred by Tenant in connection with the foregoing development work on Phase 2. <br /> 4. Development Planning. <br /> 4.1 Stanley J. How and Associates, Inc., of Omaha, Nebraska, shall be the <br /> project architect for Phase 1 and the Phase 1 Site Work ("Project Architect"). The Project <br /> Architect shall establish the architectural theme for Phase 1 in consultation with Landlord and <br /> Tenant, shall prepare the building exterior design including building elevations, materials, color, <br /> canopy sections and other pertinent details ("Building Design Drawings") for each building <br /> within Phase 1, and shall submit the Building Design Drawings for the parties' written approval <br /> no later than sixty (60) days after the date all of the conditions set forth in Article 7 (Conditions <br /> Subsequent) of the Ground Lease have been met or waived in writing by Tenant and Tenant has <br /> notified Landlord that Tenant intends to proceed with construction of Tenant's Building. The <br /> Building Design Drawings for each building within Phase 1 shall be approved or disapproved <br /> (with reasons specified) by the parties within thirty (30) days after receipt, which approval shall <br /> not be unreasonably withheld or delayed. The exterior of each building or other improvement <br /> constructed in Phase 1 shall conform with the Building Design Drawings approved pursuant to <br /> this Section 4.1. The Building Design Drawings for buildings in Phase 1 shall not be modified <br /> without the prior written approval of the parties hereto. <br /> 4 <br />