Laserfiche WebLink
202603902 <br />Exhibit "A" 06/02/2026 <br />he.* a-ftnuM+ <br />Oat on •I <br />If vr41' .1'�6' <br />c xda 1 3:tl�p peg <br />7+!Fl?l .. $umile <br />Wa r. epnf,I <br />(1) and (2) are both "bullet" type pedestals. 10"x22" round top pedestals. <br />(2) The Grand Island Streets Division shall be contacted prior to work beginning at <br />308-385-5322. <br />A Notice to Proceed with work in the ROW will not be given until a pre - <br />construction notice has been given; the City of Grand Island permit number is <br />required when requesting the Notice to Proceed. <br />(3) <br />Any keyhole potholing locations in the roadway shall be approved by the Streets <br />Division and shall be filled within five days of potholing. <br />No handholds or vaults shall be placed in the flowline or sloped bank of drainage <br />ditches. If it has to be placed on sloped bank the final grade of hand hold or vault <br />lid shall match that of the sloped bank. <br />Erosion control shall be in place for all open excavations adjacent to drainage <br />ditches. All drainage ditch flowlines must be restored before job is done. <br />No handholds, vaults, or manholes shall be placed in the ADA accessible area of <br />the sidewalk. <br />Any handholds, vaults or manholes placed in the sidewalk shall match the <br />existing slopes of the sidewalk and shall not create a tripping hazard for <br />pedestrians. <br />