Laserfiche WebLink
STAKING SHEET- UNDERGROUND <br />Company: OPTK Networks Exchange: Beatrice <br />CONSTRUCTION PROJECT NOTES <br />1. The State. County, City personnel shall be notified a minimum of forty eight (481 hours in advance of initial project <br />construction. <br />2. The utility company and the contrna t. (s) are responsible to have at least one person on the job at all times, that Is <br />'site supervisor' certified. <br />3. The contractor shall adhere to the current permit and contract specifications. <br />4. The locations of ail aerial and underground utility facilities may not be indicated on the prgea plans. The contractor <br />is required to contact the Nebraska and Colorado 811 one call notification center (dial 81 1) forty-eight (48) hours <br />poor to working in the city right of way. No excavation will be permitted in the area of the underground utilities until <br />all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible for <br />protection of at underground and aenal utilities and infrastructure. <br />5. Whenever underground facilities are in dose proximity to the proposed pathway location or whenever the vertical <br />location of the underground facility is unknown. the contractor shall use speoal measures to determine the locations <br />of such undergroud facilities. <br />a If the contractor is conducting the excavation by digging from the surface. when in a dose proximity o the <br />undegrorrd facilities, the contractor shall use hand digging. hydro excavating, or air excavating to locate such <br />facility. <br />b. If the contractor is conducting the excavation by tunneling or boning, the contractor shall determine the vertcal <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />utilities_ <br />Project plans shell dimension new facilities being installed. <br />7. Unless agreed to in suiting in advance the depth of instated facilities n city and county row shall be at a minimum <br />as follows: <br />a. Forty-eight (48i inches in soil <br />b. Forty-eight (48) inches below a projected slope from the flaw line of a drtcn at a three (3) honzontal and one (1) <br />vertical slope. <br />a Forty-eight 1481 inches under a roadway measured from the surface of said roadway to the op of the installation. <br />d. Salty (60) inches under a storm water or creek charnel design bottom or pipe, ar o <br />e. Manton a minimum of twenty -our (24) inches of vertical and Innisuntel spacing from existing utilities. <br />f. Be located as far from the existing or proposed curb line as possible to avoid potential future conflicts <br />8. Al non -street surfaoe materials that are disturbed by excavation and backfaing operations shag be replaced and <br />restored_ <br />8. City and county street surface materials disturbed shall be backfilled, tamped and repaved by city or county forces <br />or approved palm° contractor <br />10. If sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or closed, a pedestrian detour <br />shall be established and mainyned during the time of the closure and the entire pedestrian facility shall be restored <br />within seventy-two (72) hours, °Ness the contractor provides a hard surface alternate route approved by the city or <br />county <br />11. Al pedestrian detours and any reconstruction of pedesrian facilities shalt meet current Americans with Disability <br />Act (ADA) standards and specifications. <br />12. At pedestrian detours shall be part of an approved Traffic Control Plan (TCP( <br />13. Al holes made in the streets for the purpose of performng vacuum excavations to locate underground utilities shall <br />be restored to their original condition with the reinstated core flush with and in the onginal orientation as the existing <br />surfaoe matching existing pavement surface appearance. <br />14. When the contractor is not actively working; at equipment. fencing. debns, etc. Shall not be placed within the <br />triangular area required for sight ttstanoe of vehicles exiting or entering an adjacent property Or mtef520900. <br />15. At excavations shah be adequately fenced and covered when contractor is not present or project site left <br />unattended. <br />18. No lane closures allowed on arterial streets during AM and PM peak haws. <br />17. AM work zone traffic control. inducting pedestrian control measures. shall be in compliance with the MUTCD and <br />ADA. <br />18. The contractor shall mant3n a set of `as twin' plans on site with dimensioning. These plans shall be presented <br />upon request. <br />19. Final `as -built' plans shall be filed with city andfor county wiMwf 30 days of the completion of the project. <br />20. The contractor shall follow construction standards pertaining to the lateral corridor facility placement and minimum <br />depth requirements and clearance requirements of other facilities. <br />21. A current State. County. or City permit shall be maintained on each work site by the contractor. The contractor <br />shall present such perrnit upon request. <br />22. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved <br />during the pemut application process, shah oompty with the following: <br />a. The contractor must stop work immediately and contact the facility owner W the proposed changes. <br />b. The facility ~tees representative shall contact the city, county or state nght"of-way construction inspector and <br />provide them with the details. <br />c. The ROW inspector will make a determination on tow to proceed. This determnaton may range from approval <br />over the phone or via email to delaying the project until plans can be updated and appropriate review can be <br />conducted. <br />23. Stake mounted waning signs and marker posts (BM53) to be placed where appropnate. <br />24. All conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted. <br />25. Leave 120' loops (80' tails at spice perms) for marline fiber in vaults <br />LLZLO9ZOZ <br />