Laserfiche WebLink
Exhibit "A" 02/10/2026 <br />STAKING SHEET - UNDERGROUND Company: OPTK Networks <br />Exchange: <br />VZW GI Uptown, 204 W South Front St, Grand Island, NE 68801 <br />No handholds, vaults, or manholes shall be placed in the ADA accessible area of the sidewalk. <br />Any handholds, vaults or manholes placed in the sidewalk shall match the existing slopes of the sidewalk and shall not be or create a tripping hazard for pedestrians. <br />Any sidewalk removals & replacements shall be approved by the City of Grand Island prior to removal. Restoration of sidewalk shall be done within 5 days of removal <br />Any street or sidewalk closures require a 72-hour notice to the City of Grand Island Public Works Department at 308-385-5444. <br />Contractor will be required to request a locate before any physical work is to take place. Locate flags shall be removed after the excavator has determined the work is <br />A ROW inspection will be completed once work is done. All ROW shall be restored to the same condition as prior to the work taking place. <br />Where CROSSING SIGNAL INFRASTRUCTURE <br />Conduit shall not be placed between the Citys traffic signal cabinet and connecting traffic signal conduit/poles. Conduit must be offset a minimum of 5 from the base of <br />IF SIGNAL CONDUITNVIRE HAS TO BE CROSSED THE NEW LINE SHALL BE A MINIMUM OF 6 DEEP WHERE CROSSING AND THE EXSTING SIGNAL COND <br />Proposed footages <br />and materials <br />Unit <br />Description <br />500 <br />50 <br />1 <br />1 <br />48F S/S <br />HDPE 1.25" <br />Ground rod <br />24x36x24 Handhole <br />Notes/Special Instructions <br />Call Connor a few days before construction to meet at <br />site on day of construction. 402-469-2547 <br />and shall be inspected by the City of Grand Island Public Works Department <br />mplete. <br />any traffic signal cabinet, traffic signal pole, or traffic signal pull box. <br />LIT SHALL BE POTHOLED AND VERIFIED ON -SITE PRIOR TO BORING <br />