Laserfiche WebLink
202401629 <br />Removal of existing pavement headers will be measured for payment by <br />length in lineal feet. <br />Compaction over all existing utility lines will be measured for payment as a <br />single unit except when in clay soil. In clay soil, excavation, additional materials, and <br />recompaction over utility lines will be paid for as additional excavation. <br />14.03 Grading, Surplus Earth, Embankment. All grading, removal of surplus earth, <br />and embankment will not be measured for payment but shall be subsidiary to the paving. <br />14.04 Granular Foundation Course. Granular foundation course will be measured <br />for payment by area in square yards or cubic yards. <br />14.05 Manholes. Adjusting manholes to grade will be measured for payment as a <br />single unit for each manhole that is adjusted to grade as shown in the plans or as <br />directed by the Engineer. <br />14.06 Storm Sewer Inlets. Adjusting storm sewer inlets to line and grade will be <br />measured for payment as a single unit. <br />14.07 Integral Curb. Integral curb will be measured for payment by length in lineal <br />feet. Measurement will be made along the back side of the curb. <br />14.08 Concrete Pavement. Concrete pavement will be measured for payment by <br />area in square yards. Concrete pavement shall include all joints, curing, sealing, etc. not <br />specifically designated as separate items. <br />14.09 Beams. Concrete pavement beams will be measured for payment by length <br />in lineal feet. <br />14.10 Headers. Concrete headers constructed as part of the project will be <br />measured for payment by length in lineal feet. <br />14.11 Transverse Expansion and Miscellaneous Joints. Transverse expansion <br />joints and all miscellaneous joints using premoulded bituminous fiber will be considered <br />incidental to the paving construction and not as a separate pay item. <br />14.12 Concrete Test Cylinders. Three (3) concrete test cylinders shall be required <br />for each block of concrete pavement placed or as directed by the Engineer. <br />14.13 Testing. The Engineer may require testing of coarse and fine aggregates and <br />cement before they are used in the work. If so ordered, the Contractor shall pay the cost <br />thereof. <br />The testing of cylinders shall be paid for by the Contractor. <br />14.14 Miscellaneous. Any item listed in the Engineer's Estimate and not covered in <br />the specifications will be measured in the most workmanlike manner for payment <br />according to the designation listed such as cubic yards, square feet, square yards, lineal <br />feet, gallons, each, etc. <br />2-12 <br />DIVISION II — REVISED 1-18-2010 <br />Page 16 of 25 <br />