Laserfiche WebLink
STAKING SHEET - UNDERGROUND <br />Company: OPTK Networks Exchange: Grand Island <br />CONSTRUCTION PROJECT NOTES <br />1 The State County. City personnel slue be notified a minimum of forty eight 1481 hours in advent* of initial project <br />donsbucton <br />2. The Miley corrlparly and the oontracton sit are resoonsrble to have at least one person on the gib at all bines, that is <br />'site supervisor' cerUtd <br />3 The contractor shall adhere to the current permit and contract speofica°ons <br />4 The locations of as aerial and underpound utility facilities may not be indicated on the prosect plans The contractor <br />s required to contact the Nebraska and Colorado 811 one call notification center Idia) 81 1 i forty-eight (481 hours <br />poor to working in the city nght of way. No excavation wit be permitted an the area of the urhderground utilities until <br />all facilities have been located and identified to the satisfaction of all parties The contractor shall be responsible for <br />protection of a8 underground and acne) utilities and infrastructure <br />5 Whenever underground fao(ites are in close proximity to the proposed pathway locator or whenever the vertical <br />location of the underground facility is unknown, the contractor shall use special measures to determine the locations <br />of such underground facilities. <br />a 8 the contractor is cotduc0ng the excavation by digging from the surface. when el a close proximity to the <br />underground facilitesthe contractor std use hand digging. hydro excavating. or air excavating to locate such <br />facility <br />b If the contractor is conducting the excavation by tunneling or bong. the contractor shall determne the ~beat <br />location of the underground facility by potholing or any other method approved by the director of public works and <br />unites <br />O Project plans shall dimension new facitaes Peng installed <br />7. Unless agreed to in writing n advance the depth of installed tepees in city and county row shalt be at a minimum <br />as blows <br />a Folly -eight (48) inches in sou <br />b. Forty-eight (48) inches below a projected supe Som She flow lone of a ditch ata three 13) honzontai and one 11 h <br />vertical slope. <br />e Forty-e.Od (48) inches under a roadway measured from the surface of said roadway to the top of the nstallation <br />d. Sorry (00) inches under a storm water or creek channel design bottom or pipe. and <br />• Maintain a minimum of twenty -bur (24, inches of vertical and hormonal spacing from e.rsbng utNfies <br />f Be located as far from the *rising or proposed curb bre as possible to avoid potential future conflicts <br />8. Al non -street surface materials that are disturbed by excavation and backfiring operations shad be replaced and <br />restored <br />Cr City and county street surface materials disturbed shall be backfilled. tamped and repaved by city or county forces <br />0' aP0roved paving contractor <br />10. If sidewalk. wheel chair ramps or any portion of the pedestrian facnnues are removed a dosed. a pedestnan detour <br />shall be established and maintained during the bine of the closure and the entire pedestrian faoI8y shall be restored <br />whin severity -two (72) hours. unless the contractor provides a hard surface alternate route approved by the city or <br />o0umy <br />11. AM pedestrian detours and any reewhstntchon of pedestrian facilites shall meet current Americans with Disability <br />Ad (ADA) standards and specifications. <br />12. Al pedestrian detours shall be pal of an approved Traffic Control Plan (TCP( <br />13. Al holes made in the streets for the purpose of performng vacuum excavations to locate underground utilities shall <br />be restored to their original condition wd1 the reinstated core flush with and in the original onena0on as the existing <br />surface matching *instep pavement surface appearance. <br />14 When the contractor is not actively workup, a8 equprn•nt. fencing. debris. etc. Shall not be placed within the <br />triangular area required for sght distance of veMdes enteric 00 entering an adjacent property or intersection. <br />15 AM excavations shall le adequately fenced and covered when contractor is not present or prosect site heft <br />unattended <br />18 No lane closures allowed on arte0a) sorters during AM and PM peak hours <br />17 All work zone traffic o0nttd. nciudrn9 pedestrian control measures. shall be n cornplterite with the MUTCD and <br />ADA <br />18 The contractor shall manta° a set of 'as bunt' plans or site with dimensioning These plans shall be presented <br />uoon request <br />19 Final 'as -bait' plans sha8 be filed with city andto county within 30 days of the completion of the project. <br />20. The contractor shall foibw construction standards pertaining to the lateral corridor facility placement and minimum <br />depth r•qurements and clearance requirements of other facilities <br />21. A current State. County. or City permit shall be maintained on each work site by the contractor The contractor <br />shag present such permit upon request <br />22 My field adjustments to rrsta8alhon of faceibes, which vary from the pans that have been submitted and approved <br />dump the pemvt application process. shag comply with the following <br />a_ The contractor must stop work immediately and contact the facility owner of tux proposed changes <br />b. The facility owners representative shat contact the 04y. county or state nghtof-way oonstrvction Inspector and <br />provide them with the details <br />c. The ROW inspector *41 make a delennnabon ah how to proceed. This determination may range from aopmvai <br />over the phone or vat email to delayn9 the project until plans can be updated and appropriate revew can be <br />conducted. <br />23 Stake mounted waning signs and marker posts (85531 to be placed where appropriate. <br />24 AM conduit and fiber is to be installed at the back of the roadway ROW unless otherwise noted <br />25 Leave 120' loops (80' tarts at space pants 1 for mainline fiber in vaults <br />