Laserfiche WebLink
EXHIBIT "A"- 2024/3/12 <br />STAKING SHEET - UNDERGROUND <br />Company: OPTK Networks <br />Exchange: Grand Island <br />3650 W 13th St <br />Proposed footages <br />and materials <br />Unit <br />Description <br />80' <br />80' <br />HDPE 1.25" <br />800' <br />Pull String <br />24F S/S <br />Conduit shall not be placed between the City's traffic signal cabinet and connecting traffic signal conduit. poles. Conduit <br />must be offset a minimum of 5' from the base of any traffic signal cabinet. traffic signal pole. or traffic signal pull box. <br />If Signal Conduit/Wire has to be crossed the new line shall be a minimum of 6' deep where crossing and the existing <br />signal conduit shall be potholed and verified on-site by the City of Grand Island Streets Division prior to boring. <br />The Grand Island Streets Division shall be contacted prior to work beginning at 308-385-5322. <br />A notice to proceed with work in the ROW not be given until a pre -construction notice has been given. <br />Any keyhole potholing locations in the roadway shall be approved by the Streets Division and shall be filled within five <br />days of potholing. <br />No handholds. vaults. or manholes shall be placed In the ADA accessible area of the sidewalk. <br />Any handholds. vaults or manholes placed In the sidewalk shall match the existing slopes of the sidewalk and shall not <br />be or creating tripping hazard for pedestrians. <br />Any sidewalk removals & replacements shall be approved by the Grand Island Streets Division prior to removal. <br />Restoration of sidewalk shall be done within 5 days of removal. <br />Any street or sidewalk closures require a 72 -hour notice to the City of Grand Island Public Works Department at <br />308-385-5444. <br />Notes/Special Instructions <br />Maintain 3' of horizontal separation if paralleling water mains. <br />Maintain 1' of vertical separation at water main crossings. <br />