Laserfiche WebLink
This form is available electronicall <br />202400525 <br />CCC -1958 U.S. Department of AgCorporation <br />orp ltureration <br />(06-09-22)CommodityCredit Cor oration <br />FARM STORAGE FACILITY LOAN (FSFL) <br />NO REAL ESTATE SECURITY CHECKLIST <br />NOTE: This checklist is needed for partial or final disbursement. <br />1Jame of Appli ant / C\x-�'I '� J <br />a.f v-� I V <br />2ida �f lation) YYYY) <br />3.Loan No <br />n / <br />4. State ffice Name <br />/I <br />/ V <br />5.5.Cod uu3ty <br />�"' j <br />riceName <br />6. Date of Loan Approval <br />6. <br />( DD-YYYY)O�4"' <br />d — <br />7. Approval Expiration Date <br />(MM-DD-YYY_Y,)� <br />%O --t9)-0 Oa <br />Office Staff Actions: <br />Applicable References <br />(1-FSFL (Rev. 3)) <br />YES <br />NO <br />N/A <br />Initials <br />Date <br />8. Pre -Disbursement Document Review, Structure Inspection, and Determining Loan Amount: <br />A. Partial ❑ or Final <br />Paragraph 57 <br />B. Inspect and verify the amount of construction completed or facility <br />acquisition. Document on CCC -295A (FSFL Program Final Inspection ofpermanently affixed storage structure before Loan Disbursement) or <br />CCC-295C(FSFL Program Final Inspection of portable storage structures, <br />drying and handling equipment or storage and handling truck before Loan <br />Disbursement). <br />Paragraph 171.....4 <br />1L_- <br />C. Construction completed or total facility acquired. If this is a partial <br />disbursement, bills must be commensurate with work completed and not <br />exceeding 50% of the total loan amount. If this is a final disbursement, the <br />project must be entirely completed. <br />Paragraph 170 <br />X <br />^ <br />r ►�J <br />I1�L,1 <br />/ 1 <br />11 <br />D. Obtain completed CCC -197 (Final Farm Storage Facility Loan Program Cost <br />from borrower(s). <br />Paragraph 174X. <br />C <br />1 )i..j.Certification) <br />E. Obtain evidence of final net cost. <br />Paragraph 172 <br />X <br />OL <br />itaiaq <br />F. Date stamp the Original Evidence of Cost. <br />Subparagraph 172C <br />G. Verify contractor/seller has signed evidence of cost if it is not on the original <br />letterhead. <br />Subparagraph 172B <br />AX <br />C� <br />� 1) <br />H. Retain copy of original document in the loan folder. Return original evidence <br />to borrower. <br />Subparagraph 172C <br />X <br />e� <br />6 aLi <br />1. Verify the minimum down payment amount has been paid to suppliers. <br />Regular FSFL is 15%. <br />Micro FSFL is 5%. <br />Subparagraph 172A and <br />Paragraph 59 <br />a <br />1�a,a) / <br />'117 <br />J. Obtain CCC -191, FSFL Program Release of Liability, from all <br />contractors/suppliers submitting bills. <br />Paragraph 173 and <br />Exhibit 65 <br />a— <br />1 64 (j <br />K. Complete the applicable FSFL disbursement calculator. <br />2-FSFL <br />L <br />//a`I i4 <br />// <br />L. Second party review of FSFL disbursement calculator. <br />2-FSFL <br />M. Attach CCC -197 to Disbursement Calculator and file in loan folder. <br />Subparagraph 175A <br />x <br />/)` <br />a <br />I <br />169 <br />N. Verify whether obligation will need to be increased or decreased. <br />Paragraph 176 <br />�L <br />(ray <br />O. If loan increases more than 10%, complete financial analysis. <br />Subparagraph 176B <br />NiQt <br />P. If loan increases, will need to be re -approved by applicable approval official. <br />Paragraph 10 <br />and Subparagraphh 1768 <br />Q. If loan increases, complete increase in DLS. <br />2-FSFL, Part 5 <br />• <br />R. If loan decreases, complete decrease in DLS. <br />2-FSFL, Part 5 <br />1I/9 <br />U. Review financial analysis if closing delayed more than a year. <br />Subparagraph 185F <br />MO <br />9. Lien Searches and Additional Documents Needed at Loan Closing: <br />A. Obtain proof of insurance with CCC as loss payee for all items checked on <br />the CCC -185D, Item 3. <br />Subparagraph 185B and <br />Paragraphs 96-99 <br />B. Obtain proof of current real estate taxes. <br />Subparagraph 185C <br />C. Complete lien search (Document on FSA -2360). <br />Subparagraph 185D <br />D. The County Office must perform the final lien search within 5 workdays <br />before the FSFL check is requested in DLS. <br />Subparagraph 185D <br />E. If UCC Lien searches show prior UCC filings with equipment/trucks as <br />security, obtain equipment lien waivers, on CCC -190, before loan is <br />disbursed. <br />Subparagraphs 144A <br />and D & Exhibit 56 <br />