Laserfiche WebLink
PROJECT COORDINATION CONTACTS <br />NAME <br />AGENCY <br />PHONE NUMBER <br />SCOTT WILGUS <br />UNITE PRIVATE NETWORKS <br />402-710-1889 <br />SONYA CISNEROS <br />CITU OF GRAND ISLAND <br />308-389-0261 <br />EMAIL <br />SCOTT. W ILGUS@UPNFIBER.COM <br />SONYAC@GRAND—ISLAND.COM <br />PERMITS REQUIRED <br />SHT. NO. <br />DESCRIPTION <br />CITY OF GRAND ISLAND <br />SH I. NO. <br />SHEET INDEX <br />C.I <br />COVER <br />G.1 <br />GENERAL NOTES <br />F. <br />FIBER DESIGN <br />NOTE: <br />CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT TO <br />WORK IN THE ROW (INCLUDING AN APPROVED TRAFFIC CONTROL <br />PLAN) BEFORE ANY PHYSICAL WORK IS TO TAKE PLACE. LOCATE <br />FLAGS SHALL BE REMOVED AFTER THE "EXCAVATOR" HAS <br />DETERMINED THE WORK IS COMPLETE. <br />NO HH, PULL BOXES, OR VAULTS SHALL BE PLACED IN THE <br />FLOWUNE OF THE DITCH AND IF PLACED ON THE SLOPED <br />EMBANKMENT SHALL RECEIVE ON—SITE APPROVAL P1908 TO <br />INSTAWNG WHEN LOCATION IS KNOWN). CONTROL OF SILT <br />ANO RUNOFF SHOULD BE DONE IN CONJUNCTION WITH ANY <br />EXCAVATIONS ESPECIALLY THOSE PARALLEL TO THE DITCH. SEEDING <br />(AND EROSION CONTROL IF NEEDED) SHALL BE DONE AFTER <br />EXCAVATION HAS BEEN BACKFILLED. <br />GRAND ISLAND, NEBRASKA <br />UNITE PRIVATE NETWORKS <br />384123 HORNADY NN GREEN <br />EXHIBIT "A' 2022/12/19 <br />PROJECT NO. <br />SHEET NO. <br />017-0078 <br />C.1 <br />Jute: 12\13\2022 <br />Dram: TMR <br />Checked: STS <br />AgvoveL GTS <br />PROTE:T. 38423 HORNADAY <br />olsson <br />Unite <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTILTRES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTIUTIES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY. IT IS THE <br />RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CRO <br />OF GRAND ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />COVER <br />