My WebLink
|
Help
|
About
|
Sign Out
Browse
202208060
LFImages
>
Deeds
>
Deeds By Year
>
2022
>
202208060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2022 1:52:42 PM
Creation date
11/17/2022 1:45:40 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202208060
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW CONSTRUCTION PROJECT NOTES <br />1. The City shall be notified a minimum of forty eight 440) hours in advance of initial project construction. 12. 11 sidewalk, wheel chair ramps or any portion of the pedestrian facilities are removed or cbsed, a pedestrian detour shall be established <br />and maintained during the lime of the closure and the entire pedestrian facility shall be restored within seventy-two (72) hours unless the <br />2. The contractor shall adhere to the current City standard specifications, approved special provisions. City standard plans. right-of-way cunan«tiun contractor provides a hard surface alternate route approved by the city. <br />procedures manual. <br />1. The locations of all aerial and underground unlit facilitisa may t be indicated on the 13. All pedestrian detours and any reconstruction of pedestrian facilities shall meet current Americans with Disability Act (ADA) standards and <br />g y y nuproject plans. The contractor is required to contact the One speeifcalions. <br />Call 8I I notification center (dial 81 I) forty-eight (48) hours prior to working in the city right of way. No excavation will be permitted in the area of <br />the underground utilities until all facilities have been located and identified to the satisfaction of all parties. The contractor shall be responsible for <br />14. All pedestrian detours shag be pad of an approved Traffic Control Plan (TCP). <br />protection of all underground and aerial utilities and infrastructure. <br />15. All holes made in city pavements for the purpose of performing vacuum excavations to locate underground utilities shall be restored to <br />4. Whenever underground facilities are in close proximity to the proposed pathway location or whenever the vertical location of the underground <br />their original condition with the reinstated core flush with and in the original orientation es the existing surface matching existing pavement <br />facility is unknown. the permittee shall use special measures to determine the locations of such underground facilities. <br />surface appearance. <br />a. lithe permittee is conducting the excavation by digging from the surface. when in a close proximity to the underground facilities. the permittee <br />16. When the contractor is not actively working. all equipment, fencing. debris, els, shah not be placed within the triangular area required for <br />shall use hand digging, hydro excavating, air excavating, many other techniques that are approved by the City to locate such facility. <br />sight distance of vehicles exiting or entering an adjacent property or intersection. <br />b. lithe permittee is conducting the excavation by funneling or boring, the permibee shall determine the vertical location o1'fix underground <br />facility by potholing crony other method approved by the City. <br />17. All excavations shall be adequately fenced and covered when contractor is not present or project site left unattended. <br />5. Project plans shall dimension new facilities being installed. Measurements shall be taken from existing adjacent visible structures (curbs, poles, <br />18. No lane closures allowed on arterial streets during AM and PM peak hours unless approved by City Traffic and Right of Way Construction <br />cabinets, manholes, inlets. fire hydrants. etc.) clearly identifying location of such facility. The contractor shall verity dimensions taken from city files. <br />section(s) staff. <br />6. Unless specified on the plan sets, the depth of installed facilities in city row shall be ata minimum as follows. <br />19. All work zone traffic control, including pedestrian control measures. shall be in compliance with the MUTCD. ADA, and the City Standard <br />a. Thiry -two (32) inches in soil, if rock present and is an issue twenty-four 124) inches can be used. <br />Specifications. <br />b. Forty-two (42) inches below a projected slope from the flow lice of a ditch ata three (3) horizontal and one I I) venial slope. <br />20. The City shall be notified a minimum of Seventy Two (72) hours prior to any lane or road closures. <br />21. The contractor shall notify all affected owners of adjacent properties a minimum of forty-eight (48) hours prior to beginning of construction <br />c. Forty-eight (4g) inches under a roadway measured from the surface of said roadway to the top of the installation. <br />and provide updates to the affected owners when construction phases change that affect the areas of work associated with the permit. <br />d. Forty-eight (48) inches under a stone water or creek channel design bottom of pipe, and <br />22. The contractor shall maintain a set of "as built" plans on site with dimensioning. These plans shall be presented upon request to any city <br />representative. <br />e. Maintain a minimum of M -cozy -tour 124) inches of vertical and horizontal spacing from existing utilities. <br />23. A current city right of way construction permit, a city approved plan set. and traffic control plan shah be maintained on each work site by <br />f. 8c located as F from the existing or proposed curb line as possible to avoid potential Noone conflicts. <br />the contractor. The contractor shall present such permit and plan set upon request to any city representative. <br />24. The contractor shall remove locate flags after work Is complete. <br />7. All potholes in sidewalk panels will be filled unless directed by City inspector. 1l'colored, textured or patterned concrete is existing, replacement <br />patches, and panels panels will be replaced to match as practicable. Owner may be required to put money into escrow to cover all regain prior to <br />starting work. <br />25. Any field adjustments to installation of facilities, which vary from the plans that have been submitted and approved during the permit <br />application process. shah comply with the following. <br />n. All non -street surface materials that are disturbed by excavation and backfilling operations shall be replaced and restored. <br />a. The contractor must stop work immediately and contract the facility owner. <br />v. City street surface materials disnubed shall be backtilled, tamped and repaved by city tones or approved paving contractor. <br />b. The facility owner's representative shall contact the city's construction inspector and provide him with the details of the proposed <br />changes. <br />10. All Conduit. vaults and Pedestals shall be located in the public ROW and in public utility easements. <br />11. be by Pole follow <br />c. The City inspector will make a determination on how to proceed. This determination may range from approval over the phone or viae <br />Namur NI <br />All Aerial shown on attached planet will permitted separately Owners. All pole permits submitted to pole owners will <br />NCSC codes. <br />mail to delaying the project until plans can be updated and appropriate review can be conducted. <br />Su[ <br />811 <br />26. Crossing City of Grand Island Traffic Signal Infrastructure <br />Wow.1 <br />a. Conduit shall not be placed between City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles. If unable to route the <br />Cad Wore tau 44 <br />conduit around the City's Traffic Signal Cabinet and Connecting traffic signal Conduit and poles because of physical constraints, a <br />meeting will be held onsite with the contractor, city, and ALLO to determine the best conduit alignment between these structures.1.1.11111,4 <br />tea!' -met H4 - <br />stvon <br />b. Conduit shall be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, of traffic signal pull box. If <br />unnvevicustiorm.00PIXIEW <br />Conduit cannot be offset a minimum of Five (5) feet from the base of any traffic signal cabinet, traffic signal pole, or traffic signal pull box <br />because of physical constraints, a meeting will be held onsite to determine the best accommodation which may result in less than the <br />desired 5' of offset. <br />e. Conduit shall be placed six (6) feet deep where crossing existing signal conduit, Traffic Signal conduit shah be potholed and verified on- <br />MOVER <br />zrr.�.,rsm m 'V rate,, <br />SP6cl*8lhtpleguit shall be bored unless specified otherwise. <br />2. Contractors Shall notify land owner prior to work on all private developments. <br />3. A reminder to the reader. the drawings are scaled, thus dimension is available at all locations. <br />site before boring. If unable to maintain six (6) feet of depth where crossing existing signal conduit, a meeting will be held onsite <br />between the city, contractor, and ALLO to determine the best conduit alignment that may be less than 6' deep. <br />4. The contractor shall bypass all MST pedestals with distribution conduit where installed parallel to MST conduit. Similarly. <br />bypass the T18 "Flowerpot' with MST conduit where installed parallel to future drop conduit. <br />Allo <br />art <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.