Laserfiche WebLink
LEGEND OF SYMBOLS <br />EXISTING CONDUIT <br />EXISTING AERIAL FIBER <br />BORED CONDUIT <br />NEW AERIAL FIBER <br />NEW AERIAL FIBER, OVERLASH <br />MESSENGER CABLE <br />EXISTING SIGNAL CONDUIT <br />ROW <br />NEW PULL BOX <br />NEW PEDESTAL <br />NEW POLE <br />NEW DOWN GUY <br />NEW RISER <br />NEW SLACK SPAN <br />NEW SLACK LOOP <br />EXISTING PULL BOX <br />EXISTING PEDESTAL <br />EXISTING UTIUTY POLE <br />EXISTING SLACK LOOP <br />EXISTING SPLICE CASE <br />EXISTING MANHOLE <br />SIGN <br />BARRICADE <br />DRUM <br />BORE PIT <br />ARROW PANEL <br />0 <br />O <br />4 <br />E1: <br />co <br />0 <br />O <br />co <br />0 <br />n n o <br />0 <br />1<<<1 <br />CABLE AND CONDUIT DESIGNATIONS <br />B is Condit Bored (i.e. 3" 6) <br />C is Conductor (i.e. 3/C) <br />CC is Coaxial Cable <br />CCC is Camera Conuol Cable <br />CDC is Camera Detector Cable <br />CG is Circuit Ground <br />CPC is Camera Power Cable <br />DB is Direct Buried <br />DMSC is Dynamic Message Sign Cable <br />EDC is Emergency Detector Cable <br />ETW is Electric Tracer Wire <br />EX is Existing <br />Fl is Fabric Interdict <br />FLC is Fiber Locale Cable <br />FTW is Fiber Tracer Wire <br />INS is Instal <br />INT is Intraduct <br />LC is Lead -In Cable <br />M is Conduit Mounted (i.e. 2" M) <br />MB 0 Main line Conduit Group Bored (6) 1 1/4' <br />MM is Multi Mode Fiber Cable <br />MT is Main Une Conduit Group Trenched (6) 1 1/4 <br />NO is Number <br />OH is Over Head <br />PR is Pau of Communication (i.e. 6 PR) <br />REL is Relocate <br />REM is Remove <br />RGS is Rigid Galvanized Steel <br />SC 6 Service Cade <br />SL is Street Light <br />SM Is Single Mode Fiber Cade <br />T is Conduit Trenched (i.e. 3" T) <br />TW 9 Tracer Wire (black or green) <br />BOC 0 Back Of Curb <br />EOP is Edge Of Pavement <br />PCA243636-00006 <br />acx POLYMER CONCRETE AMMO' <br />San. Ho Sea Z'"`ia lstriT <br />Swop. Mem, mum. oan <br />imusv <br />Node. Nark - Lot Soo* <br />KoMorne <br />• <br />PCX% <br />ImieGtfr eneens 0U <br />UPN PULL BOX, 24"X36"X3611 <br />36" <br />AVOID WALK OR DRIVE <br />12" <br />%\ 30" <br />/\ <br />6" <br />\`i\\i\\/\\i\\i\\i\\i\\\i\\i <br />UPN PULL BOX INSTALLATION <br />ROCK <br />ABRIC <br />SUMMARY OF QUANTITIES <br />ITEM <br />UNIT <br />QUANTITY <br />CONDUIT, 2"13 <br />LF. <br />1,230 <br />TRACER WIRE <br />LF. <br />1,230 <br />UPN PULL BOX <br />EA. <br />3 <br />SPLICE ENCLOSURE <br />EA. <br />1 <br />TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION <br />LS. <br />1 <br />FIBER, 96 SM, UNDERGROUND <br />LF. <br />1,230 <br />FIBER, 96 SM, UNDERGROUND SLACK STORAGE <br />LF. <br />420 <br />"ALL FIBER (UNDERGROUND/AERIAL) AND CONDUIT (BORE/TRENCH/PLOW QUANTITIES ARE <br />MEASURED AS LINEAL FEET BETWEEN CENTERS OF PULL BOXES, CABINETS AND POLES. QUANTITIES DO <br />NOT ACCOUNT FOR ELEVATION CHANGE OR SLACX.' <br />PROJECT NO. <br />UPN: (0.32594 <br />SHEET NO. <br />7E0: 200434.77 <br />Dab: 1}JUIi2022 <br />Drawn: JOH <br />Checke0 MAF <br />Ao0,95511: LJB <br />Unite <br />ALLO COMMUNICATIONS - <br />COCA-COLA <br />1617 HOLLAND DR. <br />GRAND ISLAND, NE <br />KNOW Vaal below <br />Call balm you Mg <br />PRIOR TO CONSTRUCTION: <br />CALL Bt 1 FOR LOCATION OF <br />UNDERGROUND TELEPHONE. <br />ELECTRIC. GAS MAINS. CABLE <br />TELEVISION AND OTHER UTILITIES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND DRAINAGE <br />STRUCTURES HAVE BEEN PLOTTED <br />FROM AVAILABLE INFORMATION AND <br />THEREFORE. THEW LOCATIONS MUST <br />BE CONSIDERED APPROXIMATE ONLY. <br />IT IS THE RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT EACH <br />EXISTING UTILITY BEFORE AND <br />DURING ACTUAL CONSTRUCTION. <br />1E0 CONSULTING GROUP INC <br />DETAILS <br />