Laserfiche WebLink
aas <br />NI TF, <br />Conduit Snell Not Be Placed Between the City's Traffic <br />Signal Cabinet and Connecting Traffic Signal CondulVPoles. <br />Conduit Must Be Offset a Minimum of 5' From the <br />Base of Any Traffic Signal Cabinet, Traffic Signal Pole. <br />or Traffic Signal Pul Box <br />2. 0 S19nel ConduitAMre Has t0 80 Crossed the New Un0 <br />Shall Be a Mknklom of 6' Deep Where Crossing and <br />the Existing Signal Conduit Shall Be Potholed and Verified <br />On -Site Prior to Boring. <br />455'of2" 8,144 SM, TW <br />From UPN PWI Boz A 10 Pull Boz 1-1 <br />Install Under Sidewalk <br />Pul Boz 1-1 - Approx. 4' as1 of treat Light Pole <br />1 Ea UPN Pull Boz <br />80'of144 SM Col <br />PROJECT N0. <br />SHEET N0. <br />01T-00]0 <br />F.1 <br />Gate: 0,0,2021 <br />Harz She 1 . 50 <br />Gram: 01A <br />Cnecke0 <br />TMA <br />APProved: GTS <br />PROJECT: 21354 GRAN 23 MOVE <br />olsson <br />unite <br />mare VIVONO <br />0 25 50 <br />oris N 4- <br />IdwwW4ili110VIL <br />Calkebelmai <br />PRIOR TO CONSTRUCTION: <br />CALL 811 FOR LOCATION OF <br />UNDERGROUND TELEPHONE, <br />ELECTRIC, GAS MAINS, CABLE <br />TELEVISION AND OTHER UTILMES. <br />EXISTING UNDERGROUND AND <br />OVERHEAD UTILITIES AND <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTTED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THEIR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY. IT IS THE <br />RESPONSIBILITY OF THE <br />INDIVIDUAL CONTRACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTILITY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET <br />CRT OF GRAND ISLAND <br />STANDARD CONSTRUCTION <br />SPECIFICATIONS AND STANDARD <br />PLANS. <br />FIBER DESIGN <br />