My WebLink
|
Help
|
About
|
Sign Out
Browse
202004058
LFImages
>
Deeds
>
Deeds By Year
>
2020
>
202004058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:43:18 AM
Creation date
6/17/2020 1:38:58 PM
Metadata
Fields
Template:
DEEDS
Inst Number
202004058
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00 LEGEND OF SYMBOLS <br />ln EXISTING CONDUIT....................................... <br />EXISiNG AE]RAL FIBER --------------------- <br />�1 BOFED CONDUrT..................................................................... <br />® TRENCHED CONDUIT ................................................................... <br />® NEW AERIAL F I B E - - -J- <br />W � <br />NOCIIY RECIPIENT FIBER........................................................... <br />E>WW U3 CELLULAR CONDUIT------------------------------ <br />EXISTING SIGNAL CONDUIT ................................. <br />ROW <br />NEW PUL BCD( <br />NEW PEDESTAL 181 <br />NEW POLE <br />NEW OCTAN GUY ----i <br />NEW RISER <br />PCA243636-00006 <br />POLYMER CONCRETE ASSEMBLY <br />21'R!B'f 76' <br />�a,..r a..R.r...+...w <br />saPd::rwrioe,�.vrucs.s ' <br />N.. eoRa Sr„ard RinRQ1�M rso«�h: <br />r rr a carr �rEua <br />LOAD RAnm s <br />kwdMTnafk.P9U40Ld, Ik <br />T7 <br />PiAlIRK1: <br />:� <br />•ce"DOWN bw <br />areas <br />•...aaa.,Rer. <br />dab COW <br />ne v ,pM <br />AkMOM <br />nvra <br />RE V : . : I <br />SUMMARY <br />NEW SIAICK SPAN <br />Dfto Downs <br />(1:. <br />UNIT <br />NEW SLACK LOOP <br />CONDUIT1.5 B <br />(x) <br />8,318 <br />EXISTING Lib CELULAR PULL BOX <br />LF. <br />a <br />$ <br />EXISTING PUL BOK <br />8,916 <br />a <br />EA <br />EXISTING PEDESTAL <br />GUY <br />181 <br />3 <br />EXISTING UTIUIY POLE <br />EA <br />2 <br />UPN PUU. BOX <br />EXISTING SLACK LDOP <br />S <br />(X) <br />LF <br />E X61M SPLICE CASE <br />FIBER 144 SM OVERHEAD <br />a : , <br />75 <br />DOSING MMHOLE <br />LF. <br />Q <br />144 UNDERGROUND <br />SIGN <br />8,915 <br />A <br />LF, <br />BARRICADE <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />OF SAID ROKINAY TO IHE TOP OF IHE INSTALLATION, <br />C>rw <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK OW44EL <br />(f) <br />BORE PIT <br />D <br />E MAINTAIN A MINN A OF 24' OF VERTICAL & HORQONTAL SPACING FROM <br />EXISTING UiIITESS. <br />Aft Pte- <br />3. <br />IRK L <br />4 <br />ANY cur OR POTHOLE N A CONCRETE SIBEETS PANa Will. REQUIRE FUU. <br />CABLE AND CONDUIT DESIGNATIONS <br />B Is Conduit Bored (tn_T B) <br />LC k Lead -In Cable <br />SEAM ASPHALT MILLING AND REPLACEMENT. <br />F <br />C is conductor (B_ 3/C) <br />M is Conduit Mounted Gn.2' Mq <br />CC B O08pd Cable <br />MB a Mate Line conduit Group Bored (6) 1 V4' <br />COC 6 Camera ConNd Cable <br />MM Is Mu8 Mode Aber Cable <br />CDC 's Camera Detector Cable <br />MT Is Mein Line Conduit Group Tnmched (8) 11/4' <br />CG 's Cireilt Grolrld <br />NO Is Number <br />CPC i9 a.tiera ♦ Cable <br />OH B < M r Head <br />DB Is Ctact Burled <br />PR b Pet of Corrrrral Ion (b- 6 PFS <br />DMSC h Dynamic M 11W Sign Cable <br />EDC is Emergency D86cfor Cable <br />REE Is Rebcal6 <br />FIBRA IS o m <br />k Tracer WEB <br />FIGS IS Rigid <br />IX S Existing <br />SC IS SeNiloe Cable <br />R is Fabric Inblyduct <br />SL Is Street Ligirt <br />R C Is F1w Locate Cable <br />SM Is Single Mode Fiber Cable <br />FTW is Ftw Tracer Wine <br />T B Conduit Trenched Qe.3' 1) <br />INS Is Instal <br />1W Is Tracer Wire (black ac green) <br />INT Is lot educt <br />PCA243636-00006 <br />POLYMER CONCRETE ASSEMBLY <br />21'R!B'f 76' <br />�a,..r a..R.r...+...w <br />saPd::rwrioe,�.vrucs.s ' <br />N.. eoRa Sr„ard RinRQ1�M rso«�h: <br />r rr a carr �rEua <br />LOAD RAnm s <br />kwdMTnafk.P9U40Ld, Ik <br />T7 <br />PiAlIRK1: <br />:� <br />•ce"DOWN bw <br />areas <br />•...aaa.,Rer. <br />dab COW <br />ne v ,pM <br />AkMOM <br />nvra <br />RE V : . : I <br />SUMMARY <br />OF QUAKTMES <br />Dfto Downs <br />t <br />UNIT <br />QUANTRY <br />CONDUIT1.5 B <br />LF <br />8,318 <br />CONDUIT 1.5 T <br />LF. <br />12 <br />TRIM WIRE <br />LF. <br />8,916 <br />GRAD OLAND - NORM <br />EA <br />3 <br />GUY <br />EA <br />3 <br />STANO OFF ARM <br />EA <br />2 <br />UPN PUU. BOX <br />EA <br />S <br />MESSENGER CABLE <br />LF <br />159 <br />FIBER 144 SM OVERHEAD <br />LF <br />75 <br />144 OVERT FAD SLACK SiORAGE <br />LF. <br />100 <br />144 UNDERGROUND <br />LF. <br />8,915 <br />144 UNDERGROUND SLACK STORAGE <br />LF, <br />1 <br />-ALL FIBER (UNDERGROUND/AERIAL) AND CONDUIT (BORE/TRENCH/PLOW) QUANTITIES ARE <br />MEASURED AS LINEAL FET BEIWEEN CENTERS OF PUU. BOXES, CABINETS, AND POLES. <br />QUANTITIES DO NOT ACCOUNT FOR ELEVATION CHANGE OR SLACK. - <br />AERIAL FIBER INSTALLATION <br />PROJECT NOTES <br />Dfto Downs <br />t <br />THE LOCATIONS OF ALL AERIAL AND UNDERGROUND IITfUTY <br />,ANTS <br />UNDERGROUND TELEPHONE, <br />2. FB.D VERIFY AU. NEV&Y INSTAiLED CABLENESSENGER CLEARANCES ARE <br />FACILmES W.Y NOT BE INDICATED ON (HESE PLANS UNDERGROUND <br />CONSTRUCTED N ACCORDANCE W14 I H E NSC. <br />TE LEUISIDN AND 011 -ER iTILiTI S. <br />UTMiES, WHETHER SHOWN CA NOT, WILL BE LOCATED AND RAGGED <br />PRQ(BCr 213S44JS CHUAAR <br />AND PLUGGED 'MTH SMVAR MATERIALS AS STATED N THE CONTRACT. <br />BY 11E UiILIES UPON 11-E REQUEST OF 11E CONTRACTOR NO <br />GRAD OLAND - NORM <br />DRAINAGE STRUCTURES HAVE <br />IXCAVATION Will. BE PERMIED N IHE AREA OF THE UrDEIIGRUUrD <br />BEEN PLOTiED FROM <br />UiILmES UNTIL AU. SUCH FACILmES HAVE BEEN LOCATED AND <br />DBNRFIED TO THE SATISFACTION OF ALL PARTES, IHE CONTIOCTOR <br />SHAD. BE RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND AND <br />APPROXIMATE ONLY. iT 6 1 H E <br />AERIAL UTILITIES AND CONSmUCT10NS. <br />O I S S O n • <br />2. <br />UNLESS AGREED 10 N WRITING N AO/ANCE BY IHE GYTY, IHE DEPTH OF <br />INSTALLED FACILITES SWILL BE, AT A MINIMUM. 66 Fa.LOWS: <br />A FORTY- IWO (42) INCHES IN SOI., <br />` M' <br />PUnrte. <br />B. FORTY-1WO (42) NCI -ES BB.OW A PRQECTED SLOPE FROM 11E FLOW LINE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />OF A DiTCH AT A THREE (3) HOFMUAL AND OPE @ VERTICAL SLOPE, <br />CONSTRUCTION SHALL MEET CiTY <br />C. FORTY-EIGHT (48) INCHES UNDER A ROADWAY MEASURED FROM IHE SURFACE <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />OF SAID ROKINAY TO IHE TOP OF IHE INSTALLATION, <br />D. FORTY-EIGHT (48) INCHES UNDER A STORM WATER OR CREEK OW44EL <br />DESIGN A.OW LINE AND <br />E MAINTAIN A MINN A OF 24' OF VERTICAL & HORQONTAL SPACING FROM <br />EXISTING UiIITESS. <br />3. <br />AU. POBiOLES N SIDEWALK PANa.s Will. REQUIRE FUU. PANEL REPLACEMENT. <br />4 <br />ANY cur OR POTHOLE N A CONCRETE SIBEETS PANa Will. REQUIRE FUU. <br />PANG REPLACEMENT. <br />5. ANY CUT OR POTHOLE N AN ASPHALT STREET LANE Will. REQUIRE SE>M TO <br />SEAM ASPHALT MILLING AND REPLACEMENT. <br />F <br />AERIAL FIBER INSTALLATION <br />PRIOR TO CONSiRUCiiON: <br />CALL 811 FOR LOCATION OF <br />t INSTAIL THE MESSENGER WIIH CABLES TO SFS SAO AS SUBMITTED ON <br />COMM -SCOPE SAG DATA <br />UNDERGROUND TELEPHONE, <br />2. FB.D VERIFY AU. NEV&Y INSTAiLED CABLENESSENGER CLEARANCES ARE <br />E LECTAC. GAS MAIN, CABLE <br />CONSTRUCTED N ACCORDANCE W14 I H E NSC. <br />TE LEUISIDN AND 011 -ER iTILiTI S. <br />3. ALL ABANDONED BOLT HOLES ARE TO BE TREATED WiTH WOOD PRESERVIER <br />EXISTING UNDERGROUND AND <br />AND PLUGGED 'MTH SMVAR MATERIALS AS STATED N THE CONTRACT. <br />OVERHEAD UnLmES AND <br />4 GROUNDING TO BE INSTAUED AS STATED N IHE CONTRACT. <br />DRAINAGE STRUCTURES HAVE <br />BEEN PLOTiED FROM <br />AVAILABLE INFORMATION AND <br />THEREFORE, THBR LOCATIONS <br />MUST BE CONSIDERED <br />APPROXIMATE ONLY. iT 6 1 H E <br />RESPONSIBILITY OF I H E <br />INDMDUAL CONmACTORS TO <br />EXACTLY LOCATE AND PROTECT <br />EACH EXISTING UTIUIY BEFORE <br />AND DURING ACTUAL <br />CONSTRUCTION. <br />CONSTRUCTION SHALL MEET CiTY <br />OF GRANO ISLAND STANDARD <br />CONSTRUCTION SPECIFICATIONS <br />AND STANDARD PLANS. <br />a JOHN PAUL <br />a. gEDN(ffi s <br />E-182 <br />iA�1 <br />qP -Z 5_Zogo ,fie' <br />OF NE8�P6 <br />GENERAL NOTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.