Laserfiche WebLink
d av IScesgn <br /> CHANGE ORDER <br /> (CO) <br /> PROJECT: Hall County CHANGE ORDER NUMBER: 10 <br /> Courthouse Addition and Renovation <br /> 111 W. 1st St. CONTRACT FOR: Prime <br /> Grand Island, NE <br /> CONTRACT DATE: 8/20/2024 <br /> DAVIS DESIGN PROJECT NO.: 23-0053 <br /> TO. Chief Construction <br /> (Contractor) 3935 Westgate Rd. OWNER: Hall County <br /> Grand Island,NE 68803 200 S.Sycamore Street <br /> Grand Island,NE 68801 <br /> The Contract is changed as follows: <br /> CCP No. 22: See attached copy. CREDIT $ <br /> CCP No.27: See attached copy. ADD $ <br /> NOT VALID UNTIL SIGNED BY THE OWNER,ARCHITECT,AND CONTRACTOR. <br /> The original Guaranteed Maximum Price was $35,816,566.00 <br /> Net change by previously authorized Change Orders 0.00 <br /> The Guaranteed Maximum Price prior to this Change Order was 35,816,566.00 <br /> The Guaranteed Maximum Price will be increased <br /> by this Change Order in the amount of 0.00 <br /> The new Guaranteed Maximum Price including this Change Order will be $35,816,566.00 <br /> The Contract Time will be increased by (0) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is February 1, 2028 <br /> Note: This summary does not reflect changes in the Contract Sum.Contract Time or Guaranteed Marirnt,rn Price <br /> which have been authorized by Construction Change Directive. <br /> By. .2 5-8-26 <br /> Davis Design,Inc. Date <br /> oy.m�„yEro or n.,. <br /> Huse, Kyl .El�..c.DC.n <br /> 2°"�`I. 5/8/26 <br /> y ,,,zone os an I.a>>z-osoo� <br /> Chief Cons .t n Date <br /> By: / ,3/V <br /> Hall Ca y <br /> Dat <br /> architecture engineering interior design <br /> 1221 N'Shrcel Suite off) I incGln.Nehrnska 6°50% 02 0i6.9700 <br /> 130 South I"Street Norfolk,Nebraska 63701 <br /> 15 Eesr Main Street.Suit:201 Verrnillior.South Dokota 17069 <br />