Laserfiche WebLink
BID TABULATIONS Tuesday, August 30, 2022 <br /> Hall County, Nebraska <br /> Hall County Hwy Dept - Concrete Parking Lot <br /> Bids Due to Clerk by 5:00 PM on Monday,August 29, 2022 <br /> Bids Opened on Tuesday,August 30, 2022 at 10:00 A.M. <br /> Proposed Proposed <br /> CONTRACTOR Contractor's Bid Completion Date Completion Date Exceptions I Notes <br /> for Section#1 for Section#2 <br /> No Exceptions. <br /> Chief Industries,Inc. 10 working days 25 working days Bond was enclosed and was acceptable. <br /> DBA as Chief <br /> Construction $143,701.30 after county is after county is Areas to be coordinated accordingly. <br /> Grand Island,NE ready ready $143,500.00 was read but Unit Price calculates to <br /> $143,701.30 <br /> The Diamond Exceptions: None <br /> Engineering Co $177,560.77 11/18/2022 5/31/2023 Bond was enclosed and was acceptable. <br /> Grand Island,NE $177,374.30 was read but Unit Price calculates to <br /> $177,560.77 <br /> Exceptions:Tear out by others. Includes Cure <br /> Material, Expansion 1/2", Final Grading/Screening, <br /> H&H Concrete and concrete Pump, &dowels/keyway. Does not include <br /> Construction,LLC $163,334.00 11/1/2022 11/1/2022 rebar/wire mesh material, any fill material, anchor <br /> Doniphan,NE bolts,steel bollard posts. <br /> Bond was enclosed and was acceptable. <br /> $163,334.00 was read but Unit Price calculates to <br /> $163,334.44 <br /> Exceptions: Due to current market condition and <br /> supply line problems, Heartland Concrete will <br /> Heartland Concrete maintain proposed completion dates as long as <br /> &Construction $167,894.50 10/14/2022 11/18/2022 concrete supply is not interrupted. Heartland <br /> Hastings, NE Concrete does not accept liquidated damages for <br /> supply chain issues beyond it's control <br /> Bond was enclosed and was acceptable. <br /> Exceptions: Completion date cannot be determined <br /> due to shortage of cement in the industry.Availability <br /> Lacy Construction of concrete will determine completion of this project. <br /> Company $185,712.70 11/18/2022 5/31/2023 Also due to current workload,which is affected by <br /> Grand Island, NE concrete availability,we won't be available till the end <br /> of October 2022. <br /> Bond was enclosed and was acceptable. <br /> Bigzby's, Inc. DBA 25 days after 25 days after Due to material costs increasing after 12/31/2022, <br /> Bigzby's Concrete $144,825.32 demo is demo is there could be a price increase. Completion dates for <br /> Grand Island, NE completed completed this project depends on the availability of concrete at <br /> the time of execution. <br /> ACCEPTED BIDDER: Chief Industries, Inc. DBA as Chief Construction of Grand Island, NE <br /> ACCEPTED $143 701 .30 <br /> TOTAL BID: <br />