Laserfiche WebLink
7.10:00 A.M. PUBLIC HEARING 1 & 6 ROAD PLAN — Sorensen made a motion and <br /> Quandt seconded to open the public hearing for the One & Six Road Plan. Bredthauer, <br /> Hurst, Lancaster, Quandt, Richardson and Sorensen all voted yes and no one voted no. <br /> Peterson was absent. Motion carried. <br /> Highway Superintendent Don Robb presented a power point for the 1 & 6 program <br /> COMPLETED 2021 — 2022 PROJECTS <br /> • C40(372) bridge replacement on Sky Park road <br /> • C40(462) replaced timber bridge on Burwick Road <br /> • C40(467) replaced CBC with 48" CMP <br /> • C40(470) resurfaced 2 miles on 13th between 60th & Engleman <br /> • C40(476) replaced failing culvert with triple 54"CMP <br /> • C40(479) replaced failing CMP with new CMP <br /> • C40(481) culverts will be delivered 7/6/2022 <br /> • 2 miles of resurfacing on Gunbarrel & 1 mile on Bismark <br /> • 1 mile resurfacing to start on Airport Road <br /> ASPHALT RESURFACE PROJECTS <br /> • C40(483 90TH Road between 1-R and Chapman Road <br /> • C40(484) Airport Road between 60th & Engleman Road <br /> • C40(486) Shady Bend from US Hwy 34 to south of BNSF railroad tracks <br /> • C40(487) Husker Hwy from Alda Road to Monitor Road <br /> • <br /> Mr, Robb noted the following projects <br /> • C40 (340) replace bridge with CBC they want to move the as line off of the bridge. <br /> • C40 (432) Rosedale replace CMP <br /> • C40 (434) Burwick fracture critical bridge <br /> • C40 (435) Cedarview replace bridge <br /> • C40 (391) Old Potash replace box with combo bridge <br /> • C40 (371) 60th Fracture critical bridge <br /> • C40 (493) Giltner replace box culvert <br /> • C40 (494) Platte River Drive replace culvert <br /> • C40 (495) Platte River Drive replace culvert <br /> • C40 (496) Platte River Drive Replace CMP <br /> • C40 (497) Bluff Center Road replace bridge <br /> He also noted the grading projects. In the 6 year plan there is C40 (498) on Wood River <br /> Road that has the salt damage. <br />