Laserfiche WebLink
Traffic Engineering Study <br /> Horizontal Clear Zone Requirements <br /> Monitor Road north of Platte River Drive <br /> 2022-01-03 <br /> The First approximately 4,000'of Monitor Road north of Platte River Drive <br /> If the standard for new construction for a local road with under 50 ADT was applied to this section of Monitor <br /> Road,it would call the following: <br /> Design Speed:50 mph <br /> Lanes:2 <br /> Lane Width: 10 feet <br /> Shoulder width:3 feet <br /> Horizontal Clear Zone: Nominal Shoulder width <br /> The surveyor has determined the centerline for the roadway. Using this centerline,trees would be cleared <br /> that have the closest face within 13 feet from the centerline of the road. <br /> Remaining approximately 1,280' of Monitor Road <br /> I recommend not reclassifying this section of roadway, but apply the same standards for a Remote <br /> Residential road with under 50 ADT to this section of Monitor Road: <br /> Design Speed:35 mph <br /> Lanes: 1 provided sight distance is adequate, and it is) <br /> Lane Width: 12 feet <br /> Shoulder width:3 feet <br /> Horizontal Clear Zone:Nominal Shoulder width <br /> The surveyor has determined the centerline for the roadway. Using this centerline,trees would be cleared <br /> that have the closest face within 9 feet from the centerline of the road. <br /> Steven P Riehle <br /> Hall County Engineer <br /> �� PL C 1 V q++N +� <br /> 44 4 <br /> 4TgVEN 12' �% <br /> - <br /> P RIEHLE <br /> E-6350 <br /> J-2' 22-04-04 5A <br /> '���4 <br /> 4404 OF F N BRP�`- <br />