Laserfiche WebLink
HALL COUNTY PUBLIC WORKS DEPARTMENT <br /> 11ALj, �� <br /> :C��� 2900 WEST 2nd ST, GRAND ISLAND, NE 68803-5263 <br /> N ••., �i www.hallcountyne.gov <br /> u: ', `. PHONE: (308) 385-5126 FAX: (308) 381-6486 <br /> ce= 1C114t. = . <br /> Steven P.Riehle,P.E. <br /> •:.1- it ; *�� County Engineer/Highway Superintendent <br /> �% .....SStever@hallcountyne.gov <br /> IkOR PI <br /> September 28, 2021 <br /> Mark Traynowicz, State Bridge Engineer <br /> NDOT Bridge Division <br /> Post Office Box 94759 <br /> Lincoln, Nebraska 68509-4759 <br /> Re: Request for Extension of Time <br /> County Bridge Match Program <br /> Project Number STWD-CBMP(2) <br /> Control Number 00974A <br /> Hall County Project Number C40(340) <br /> 70th Road between Airport Road and NE Highway 2 <br /> Hall County has not completed the preliminary and final design work on the above project because <br /> of a number of factors including the flooding of 2019, COVID in 2020, employee turnover and time <br /> constraints of existing staff. Physical construction on the project is supposed to be completed before <br /> December 31, 2021. This timeline appears to be difficult to meet, so we are formally requesting a <br /> time extension for completion of the project. <br /> While we hope to complete the project in early 2022, contractors are busy, material delivery can be <br /> problematic, environmental clearances could be slow, and there may be other things out of our control <br /> that could cause delays.Thus we would like to request the time for completion of physical construction <br /> be extended to November 1, 2022. <br /> Please feel free to contact me if you have any questions on this time extension request. <br /> Sincerely, <br /> Ljtaceif ./(.744. <br /> Steven P. Riehle <br /> Hall County Engineer/ Highway Superintendent <br /> cc: Hall County Board <br /> Hall County Project File <br />