Laserfiche WebLink
4 <br /> C40 (470) asphalt overlay on 13th Street finished the drive ways and shouldering that <br /> C40 (471) finished asphalt overlay on Meadow Lane Subdivision <br /> C40 (472) joint project with the city for the resurfacing on Schimmer & Blaine <br /> completed <br /> C40 (476) replaced a culvert on Airport Road that was failing and then the asphalt patch <br /> was done in July originally the road was closed but the asphalt was done under traffic <br /> condition <br /> C40 (477) on Airport and North Road drainage study ditch work and berm work and <br /> want to raise the berm <br /> C40 (171) BRO 7040(25) replaced a pony truss bridge and graded the road Steve noted <br /> it is a nice looking bridge and it will last <br /> He reviewed the following projects that are in the 1 & 6 <br /> C40 (340) timber bridge need to replace with triple CMP and headwalls & wing walls <br /> C40 (372) concrete precast panel bridge do channel work backfill and grading <br /> contractor to build bridge <br /> C40 (432) box culvert <br /> C40 (462) timber bridge replaced with CMP <br /> C40 (467) timber bridge replaced with CMP <br /> C40 (470) resurfacing projects <br /> C40 (473) resurfacing projects <br /> C40 (479) culvert that is failing and added <br /> C40 (480) resurfacing project <br /> C40 (481) 2 culvert on buffalo road temporary patch and need to replace <br /> C40 (482) this is the Platte Valley Industrial Park it is a joint project with the NRD and <br /> City. <br /> Bredthauer ask if there was an extension of the bridge project extension and if it would <br /> be box culverts of the bridge project it will be box culverts has the price gone up do not <br /> have the cost this has been delayed <br /> The bids for C40 (372) will be opened and will be awarded today showed a picture <br /> Steve reviewed some of the projects that were added <br /> C40 (479) was added this year it is a culvert that is failing <br /> C40 (480) this is a resurfacing project <br /> C40 (481) this is 2 culvert have a temporary patch and they may consider a single <br /> culvert <br />