Laserfiche WebLink
grinding he feels it will make a smooth ride. Steve wants to come back with the list of <br /> bumps that need to be ground and work with J.I.L and set a date of May first. <br /> Sorensen thanked J.I.L for coming three have been mistakes and he thinks they are <br /> willing to fix the road and they need to get Wood River taken of first. <br /> Lancaster Wood River Road is one issue and she ask if the Cairo village board involved <br /> there was a part that was the village Steve said most of it was in the corporate city limits <br /> and there was some that has the 45 minute speed limit that would be county. <br /> Lancaster stated Steve needs direction <br /> Karen she agrees with the grinding of Wood River Road and expressed concern that <br /> some of it is down to the old asphalt. Steve said there were 2 spots the thickness of the <br /> overly was thin they found 2 yesterday and J.I.L will fix those. She wants to make sure <br /> those are covered. <br /> Bredthauer made a motion and Peterson seconded to allow J.I.L to grind the Wood <br /> River Road and to overlay parts that need to be overlaid to insure a smooth road and <br /> set a deadline of May 1St. Steve Riehle will make decisions that it meets the county <br /> specifications. Bredthauer, Hurst, Lancaster, Quandt Peterson, Richardson and <br /> Sorensen all voted yes and none voted no. Motion carried <br /> Quandt questioned if it is not a good road after they do the grinding what are the options <br /> Steve and Sarah have looked at the contract and this is the first step but there could be <br /> removal and replacement and there are some guidelines. <br /> Steve stated the reports and graphs will be included this is the right thing to do. <br /> Richardson stated she has worked with J.I.L. and appreciates that they will make it <br /> right. <br /> 8B) SCOTT SORENSEN & KAREN BREDTHAUER PUBLIC WORKS UPDATE <br /> Sorensen stated they met with the road Department employees and there are concerns <br /> about the gravel from Mid Nebraska Aggregate. They have asked them to stop hauling <br /> because they are not getting the gravel they originally requested and have ask them to <br /> find a better product. Mark with public works is testing the gravel and they also had GSI <br /> test it. Scott distributed a spread sheet showing the results. He noted that the average <br /> is 78.8 and 80 is the bottom number. He expressed concern that the lowest may not be <br /> the best. They hope that Mid Nebraska will get some better product he has ask Sarah <br /> regarding the right of refusal. <br /> Steve have raised the specs and have an incentive. Good gravel makes a good road <br /> the 78.8 would have a 10% penalty want better gravel <br /> 6 <br />