Laserfiche WebLink
NEB <br /> Good Life. Great Journey. <br /> DEPARTMENT OF TRANSPORTATION October 15, 2018 <br /> HALL COUNTY CLERK <br /> 121 S PINE ST <br /> GRAND ISLAND NE 68801 <br /> The Nebraska Department of Transportation (NDOT) is responsible for constantly evaluating ourstatewide transportation <br /> system to ensure taxpayer funds are being spent in the most effective way possible. As a result, there are times when a <br /> project's schedule may shift due to funding availability and emerging needs. <br /> In April of 2016, the community of Grand Island was told that work on the Jct. US-281 West, Grand Island project was <br /> anticipated to begin in the spring of 2020. However, in the preparation of NDOT's annual program book for fiscal years <br /> 2019-2024, we have recently reviewed and updated the timeline and construction schedule forthis project. After this <br /> review, it has been determined that the Jct. US-281 West, Grand Island project will not begin in 2020 as originally <br /> thought and a revised construction schedule has not been determined at this time. <br /> Although this change in schedule will impact the start of construction, NDOT remains committed to delivering this project. <br /> As stated in 2016, the project is necessary to accommodate traffic increases associated with development in the area. <br /> Additionally, the project would have safety benefits by creating more space between the roadway and the active railroad <br /> line running through the same location, as well as upgrading the highway's intersections with connecting streets to <br /> current design standards. <br /> Specifically, the project would create a four-lane expressway with a 40-foot depressed median in the rural portion of the <br /> project—west of the Monitor Road intersection to Engleman Road—and a 30-foot raised median in the urban portion — <br /> Engleman Road to Claude Road. Additionally, North Road and Stolley Park Road would be realigned and a portion of <br /> Monitor Road would be relocated to accommodate the new US Highway 30. <br /> The proposed project would require the acquisition of additional property rights for construction throughout the project <br /> area, including new right-of-way, temporary easements, permanent easements, and control of access. Property <br /> relocations are also anticipated. Access to adjacent properties would be maintained during construction but may be <br /> limited at times due to phasing requirements <br /> It is anticipated that funding for this estimated $29 million project would come from state funds,including resources from <br /> the Build Nebraska Act, as well as local sources. <br /> Throughout this process, NDOT is committed to keeping the community informed of progress on the Jct. US-281 West, <br /> Grand Island project. As the project progresses you can access updated information on the NDOT website at <br /> https://dot.nebraska.qov/protects/future-proiects by clicking on the"Jct. US-281 West, Grand Island" link. <br /> Please contact NDOT's public involvement section with questions. Sincerely, <br /> C <br /> Sarah R. Soula <br /> (402)479-4871 <br /> sarah.soula(cDnebraska.gov <br /> SRS/com17-zv <br /> Kyle Schnewels.PS.D rector <br /> Department of Transportation <br /> 1500 I Ighwav2 OFFICE 302-47".4557 FAX 402-479-4325 <br /> PO Box 97759 0190LContanIllsr0nebraskagov <br /> Locals,NE 68509-4759 <br /> dot.nebraska.gov <br />