My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/04/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
09/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 10:26:40 AM
Creation date
2/8/2019 9:32:43 AM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HALL COUNTY HIGHWAY DEPARTMENT <br /> 4 _' .1, r_�'i, 2900 WEST 2ntl ST, GRAND ISLAND, NE 68803-5263 <br /> . 4 www.hallcountyne.gov <br /> 5 �' rr PHONE: (308) 385-5126 FAX (308) 381-6486 <br /> r ' ` Steven P.Riehle,P.E. <br /> County Engineer/Highway Superintendent <br /> steveriahallcountyne.gov <br /> tip t3 R.#0"_.� <br /> August 29, 2018 <br /> Summary of County Board Agenda Item <br /> Discussion and consideration of awarding bids for fall 2018 asphalt resurfacing. <br /> Background <br /> Bids for the fall 2018 resurfacing were opened on August 21, 2018. Bids were referred to the <br /> County Engineer to review and come back with a recommendation at the September 4, <br /> 2018 county board meeting. <br /> Gary Smith <br /> Summary of the bids JIL Asphalt Paving Construction Enginer's Opinion <br /> Co. Company, Inc. of Cost <br /> One-R Road east of Nebraska Highway 11 $ 459,788.60 $ 465,960.00 $ 415,040.00 <br /> Hillside Drive in Cairo $ 47,142.75 $ 34,680.00 $ 35,000.00 <br /> Holling Road west of Aida Link L40C $ 21,819.50 $ 21,541.60 $ 22,200.00 <br /> Wood River Road west of Nebraska Highway 11 $ 499,447.75 $ 542,200.00 $ 514,120.00 <br /> Grand Total $ 1,028,198.60 $ 1,064,381.60 $ 986,360.00 <br /> While the overall bids were above the engineer's opinion of costs, 3 projects were under the <br /> estimate. The typical range for an engineer's opinion of costs is to be plus or minus 10% of <br /> the bids. The bids on One R Road were 11% to 12% over the estimate. An evaluation of the <br /> unit price bids showed a higher than anticipated unit bid price for Asphaltic Concrete Type <br /> "SPR", The price was determined to be higher because no milling work is being done on <br /> One R Road to produce Recycled Asphalt Pavement (RAP) for use in the hot mix, thereby <br /> increasing the amount of asphalt binder needed. The unit price was also higher because the <br /> price for the asphalt binder is being impacted by reduced refinery capacity. Discussions with <br /> and evaluations of numbers from the NDOT revealed that the increase in binder costs has <br /> increased the price of hot mix asphaltic concrete in Hall County by up to $7.40 per ton. <br /> Discussion <br /> The bid specifications for the fall 2018 resurfacing include the following language: <br /> • The projects are tied and the contract will be awarded to one contractor. <br /> • The award and contract for 2018-2019 ASPHALTIC CONCRETE RESURFACING (PHASE 1 <br /> FALL 2018) will be awarded to a single contractor based upon the sum of the bids for the <br /> sections of road that are to be resurfaced and awarded. <br /> • Hall County reserves the right to reject any or all bids, or parts thereof and award contracts <br /> as may be deemed to be in the best interest of the County. The best interest of the County <br /> may include but not be limited to: <br /> o exceptions to the specifications; <br /> o total bid; <br />
The URL can be used to link to this page
Your browser does not support the video tag.