My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/21/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
08/21/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 9:46:23 AM
Creation date
2/7/2019 3:18:13 PM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID TABULATION SHEET <br /> Hall County, Nebraska <br /> 2018-2019 Asphaltic Concrete Resurfacing <br /> Phase 1 - Fall 2018 <br /> One R Road from NE Hwy 11 to Schauppsville Road <br /> Hillside Drive east of NE Hwy 11 <br /> Wood River Road from Bluff Center Road to NE Hwy 11 <br /> Hailing Road west of Aida Link L4OCI <br /> Bids Due to Clerk by 5:00 PM on Monday, August 20, 2018 <br /> Bids Opened on Tuesday, August 21, 2018 at 10:00 A.M. <br /> CONTRACTOR Contractor's Bid Exceptions/Notes <br /> Gary Smth Construction <br /> Co., Inc. $1 ,064,381 .60 Bid Bond enclosed and acceptable. Adddendum <br /> Grand Island # 1 dated 8/15/18 acknowledged. No Exceptions. <br /> JIL Asphalt Paving Co. $1 ,029,198.60 Bid Bond enclosed and acceptable. Adddendum <br /> Grand Island # 1 dated 8/15/18 acknowledged. No Exceptions. <br /> Vontz Paving, Inc. No Bid <br /> Hastings <br /> Werner Construction, Inc. No Bid <br /> Hsatings <br /> ACCEPTED BIDDER: To Be Determined at September 4, 2018 Board Meeting <br /> ACCEPTED TOTAL BID: <br /> Engineer's Opinion of Cost was $986,360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.