My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2018
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2018
>
07/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 1:41:54 PM
Creation date
2/7/2019 2:16:03 PM
Metadata
Fields
Template:
Marriage License
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The roads that are being considered for the spring 2019 resurfacing include (16 miles): <br /> • 13th Street west of Engleman Road. (2 miles) <br /> • Airport Road west of Webb Road (2 miles) <br /> • Bismark Road west of Gunbarrel Road (1 % miles) <br /> • Barrows Road east of US Highway 34/281. (0.5 mile) <br /> • Engleman Road south of Husker Highway. (1 mile) <br /> • Gunbarrel Road between US Highway 34 and Seedling Mile Road. (3.5 miles) <br /> • Husker Highway west of US Highway 30 (2 '/ miles) <br /> • Old Potash Highway west of Alda Road. (2 '/ miles) <br /> • Shady Bend Road south of Capital Avenue (1/2 mile) <br /> The budget I submitted shows $920,000 for Bituminous Surfacing and $145,348.14 of <br /> Federal Funds Purchase Program (buy back dollars) for asphalt resurfacing. If approved, <br /> it would allow $1,065,348.14 for asphalt resurfacing in fiscal year 2018-2019. We <br /> generally do around half of the resurfacing work in the fall and the other half in the spring. <br /> I'm shooting for around If the resurfacing dollars are reduced during the budget process, <br /> we'll reduce the size of the spring 2019 asphalt resurfacing. The last 3 years we've <br /> averaged $1,033,000 of asphalt resurfacing. <br /> Recommendation <br /> Approve the list of roads for the fall 2018 resurfacing and set the bid opening for the fall <br /> 2018 asphalt resurfacing for Tuesday, August 21st at 10:00 a.m. <br /> L:51-boeit Pihk <br /> Steven P. Riehle <br /> Hall County Engineer/ Highway Superintendent <br />
The URL can be used to link to this page
Your browser does not support the video tag.