Laserfiche WebLink
15. DISCUSSION OF HALL COUNTY FACILITIES MASTER PLAN WITH JERRY BERGGREN <br /> -Richardson stated that Mr. Berggren met with the facilities committee and Jerry and Marvin <br /> Webb are here to present the Facilities Master Plan to the county board. They looked at all of <br /> the county facilities and have a plan to use the facilities in a better manner Mr. Berggren <br /> referred to the executive summary that noted the attached executive summary and the top 10 <br /> priorities on the list. <br /> • County Attorney Child support division will move in the near future to the Federal <br /> building <br /> • Storage building is not utilized and has potential the material could be removed and <br /> renovated to serve HHS <br /> • County Annex Building is underutilized is a large building hand was designed for high <br /> security could move county court into the building there could be a floor added on top or <br /> an addition on the side could be a location for juvenile court in the future the Veterans <br /> Service office may need to be relocated <br /> • Suggested a central singular security access point for District Court and County Court he <br /> suggested an underground entrance this could be a free standing building <br /> • Use the lower level of the Annex Building for the courts and there would be space for 12 <br /> secure parking spaces under the annex <br /> • The HHS building is inadequate and HHS should be relocated and the building removed <br /> • They recommended that the old jail be demolished for further redevelopment <br /> • The Plaza Building is separated from the Hall County Campus but it is an asset because <br /> of the parking and there will also be additional space available soon <br /> • The County Attorney's offices could all be relocated to the Federal Building <br /> • He addressed the concern of moving documents form one place to another and <br /> suggested using tubes to do so <br /> Arnold noted that there was never mention to adding on to the annex building. He expressed <br /> concern on moving HHS to the storage building in the past there was discussion to remove it for <br /> more parking. <br /> Mr. Berggren stated that the storage building is much more usable and you could get into that <br /> building for fewer dollars the old HHS building has served it life. <br /> Arnold questioned how close the offices in the old HHS Building need to be to the HHS offices <br /> in the Old City Hall building. Jerry stated it may be an inconvenience for them but it is not <br /> critical. He questioned if the County Attorney building would be a better place <br /> Jerry stated that the county attorney building would not be adequate for HHS. The cost to <br /> renovate the storage building would be about $70.00 a foot vs. $100.00 to $200.00 a foot for the <br /> County Attorney building. <br /> Lanfear stated that the county needs to learn to get rid of stuff. <br /> Jerry stated HHS would occupy the entire building but they may remove the triangle shape to <br /> make more parking. <br /> Arnold also stated he had no idea of having and entrance underground. <br /> 5 <br />