Laserfiche WebLink
201007863 <br />or twenty (20) Business Days (in the case of a nan-mpn�tary default) follawin� <br />notice of such breach or default from the Authority to the Owner, nrovided <br />however, that if a non-manetary default cannat reasonably be cured within twenty <br />(20) Business Days and the Ovmer commenc�s a cure within twenty (20) <br />Busin�ss Days and proceeds in good faith to effect such cure thereaf't�r, the cure <br />period with respect to such breach or default shall be extended for up ta the lesser <br />of (x) an additional thirty (3�0) Busin�ss Days or (y) the latest pennissihle date for <br />correction of the applicable breach under the Program Requirements without <br />causing a Recapture Event; <br />(ii) The commencement of foreclosur� proceedings with respect to any Deed <br />of Trust which has not been withdrawn or dismissed within thirty (30) calendar <br />days aft�r the date of such commencement; <br />(iii) The Owner's failure to perforni any term or condition of this Agreement; <br />provided, however, that if a cure period is provided for the remedy of such failure, <br />Qwner's fs�ilure to perform will not constitute an Event of Default until such date <br />as the speci�ied sure period expires; <br />(iv) A violation of any law, regulation ox order applicablc to th� Owner or the <br />Praject that has ar mi�ht reasonably be expected to have a material adverse <br />impact on the operation of the Project and is not cured within the applicable cure <br />period, if any, provided in such law, regulatian, or order; or <br />(v) A default has occurred under the LUR.A., which is nat cured within the <br />time period for cure as provided therein; or <br />(vi) Gross neglige�tce, fraud, wiliful miscanduct, misappropriation nf the <br />Subaward, or criminal activity by the Owner; <br />(vii) A Reeapture Event shall occur and the Recapture Amaunt due in <br />connection therewith shall remain unpaid for a period of ten (10) Business Days <br />after notice thereof fronz the Authority ar Treasury, unless a later date is specifierl <br />in such notice; <br />(viii) The Owner fails ta comply with the Construction/Draw Schedule set farth <br />in Exhibit F and the Authority has determined that the Project cannot be <br />completed by the Placed In-Service 1]ate; <br />(ix) A breach by the Owner of any or its representations, warranties and <br />covenants contain.ed in this A$reement that has a material advexs� impact on the <br />Project; <br />(x) The Owner fails to timely execute an amendment to this Agreement in <br />such form as the Authority requires because of changes to the Program <br />Requirements; <br />-18- <br />4848-2332-1094.2 <br />