Laserfiche WebLink
2oioo�s3� <br />EXHIBIT F <br />CONSTRUCTION / DRAW SCHEDULE <br />Date Construction Com letion % �xchan e Funds Amount <br />9/1/2010 Construction Start <br />9/30/2010 Close with S ndicator <br />11/1/2p10 16p2 30°/a R� ort to NI�A <br />11/30/2010 First draw on 1602 funds $ 360,000 <br />12/31/2010 Second draw on 1602 funds $ 3fi0,pQ0 <br />2/28/2Q11 Ins ection and Draw $ 27'0,000 <br />3/31 /2Q 11 25% <br />3/31/2011 ins ection and Draw $ 357,143 <br />4/30/2011 �5% <br />6/30/2011 25% <br />7/31/2011 Final 10% draw on 16p2 funds $ 149,683 <br />7/31 /2011 ��% <br />TOTAL 10p% $ 1,496,825 <br />