Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> SPECXFICATIo,';s <br /> <br /> <br /> SECTION I <br /> SITE 'PUVARATT N <br /> <br /> <br /> <br /> <br /> <br /> 1• Stripping an: top Ec:il fry;, buildin, site 0n 1:., and <br /> providing fill dirt as requil-ed to Ir.ing er.t re .builds,-g to <br /> <br /> sub-grade is the ro,;ptv nsibilt-. of !;xz F Can ,tructi,on. <br /> <br /> <br /> 2.. CHIEF Gonstructirn to provid,i 12" of gravel fill an to cf <br /> <br /> cc-zipacted fill dirt and add V of fill sand on top of gravel <br /> for leveling bed. <br /> <br /> <br /> <br /> 3• 6" roLnd P.V.C, pipe to be installed to the 12" of gravel fill <br /> ~+r plans prepared by superior Industries Inc.) I,.V.C. <br /> <br /> pipr to be perforated on the bottom, and be b'O <br /> an center. <br /> Each P,11-C. s <br /> pipe to receive a elbow with a radent screen, <br /> <br /> <br /> SECTION 2 <br /> CONCRETE- <br /> <br /> s <br /> 1. ir,')OTINGS: 8" concrete footing to be 1vori.me,ter of buiIdin <br /> <br /> 'as per drawing.) S <br /> <br /> <br /> 2. PIERS: Concrete piers for main :pipe column.A. , <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> r <br /> <br /> <br /> <br /> <br /> 1 <br />