Laserfiche WebLink
79--~G3~$~ ~ <br />set forth in Paragraph t.i as may be required in conrec- <br />don with the replacement of such Work, <br />].3.74 Providing, professional services made necessary <br />by the default of the Contractor or by major defects in <br />the Work of the Contractor in the performance of the <br />Construction Contract. <br />].3.tj Preparing a set of reproducible record prints of <br />drawings showing significant changes in the lh•`ork made <br />during the construction process, based on marked-up <br />prints, drawings ant! other data famished by the Conirac- <br />t~• to the Architect. <br />1.3.76 Providing extensive assistance in the utilization <br />of any equipment or system such as initial swrt-up or <br />testing, adjusting and balancing, preparation of operation <br />and maintenance manuals, training personnel for opera- <br />. lion artd maintenance, and consuRation during operation. <br />t.3.t7 Providing services after issuance to the Owner of <br />the final Certificate for Payment. <br />],3.]8 Preparing to serve or serving as an expert witness <br />in connection with any public hearin;{, arbitration pro- <br />weding or legal proceeding. <br />7.3.'9 ?roviding services of professional consultants for <br />oti+er than the normal structural, mechanical and rledr.- <br />ca! engineering services for the Project. <br />1-}38-•?raviding• •-n++t- erthc r x+~-'reel ~+et-nthrnv;se•-in- <br />e+vefed-iMi~: Agxr+nrnl-ex-ms~tv?Mmerir Frrni-.lied-in <br />aeeortlan+4!-•s.+t1r-grneneFfreeeepted-asc:`~itecta,u= flc.ctite <br />ARTICLE 2 <br />7f-lE OWNER'S RESPON51131LiT1E5 <br />2.7 The Owner shall provide fait information, including <br />a complete program, regarding his requirements for the <br />Pro}est. <br />z.2 The Osvner shall designate, when necessary, arep- <br />resentative authorized to act in his beha(t wlt~ respect ro <br />the Project The Owner shad examine documens seb- <br />miued by the Architect and shall render decisions per- <br />taining thereto promptly, to avoid unreasonable delay in <br />the progress of the Architect's services. <br />3.3 Tfie Owner shah f{irnisfi a certified 'and survey of <br />the site giving, as applicable,-grades and lines of strt•rts, <br />a.!eys, pavements and adjoining property; rights-of-way, <br />tcsuictioas, easements, encroachments, zoning, dreci re- <br />strictions, boundaries and contours of the site; tocatior.s, <br />dimensions and complete data pertaining to existing <br />buildings, other improver+ents and trees; and fu!; irfor- <br />mation tor.[erning oval"able servile and u;~'.ity nes both <br />public and private, aboee and beincv grade, :nc'udi^g <br />inverts and depths. <br />2i The Owner shall furnish the seroin•s of a se?s cngi- <br />neer or other consultant alien such services are deemer. <br />nectssary by the Architect, including rcpt rs, test ur•ngs, <br />lest pits, snit bearing values, pereolat;on ;gists, air anr! <br />water pollution tess, ground corrosior. and resistivity <br />test, acrd oilier necessary operations for determin?ng sub- <br />sn•~, air and water conditions, witfi apprgpr;ate aro`es- <br />sipndl iCCOmmendatiOnS. <br />r~ <br />2.5 The Owner s!ra') furnish structural, mechanical, <br />chemical and other hrburatory tests, inspections and re- <br />ports as required by law or the Contract Documents. <br />2.6 The Owner shat: famish such Iega1, accouming, and <br />insurance counseling sen~ices as may be necessary for the <br />Project, and such audrGng services as he may rrctuire to <br />ascertain how or for v~hat purposes tltie Contractor has <br />used the moneys paid to him under the Construction <br />Contra Ct. <br />2.7 The services, information, surveys and reports re- <br />quireri by Paragraphs 2.3 through 2.G inclusive shall be <br />furnished at the Owner's expense, and the Architect shall <br />be entitled to rely upon the accuracy and completeness <br />thereof. <br />2.¢ If the Owner becomes aware of any fault or defect <br />in the Project or non-conformance with the Contract <br />Documents, he shall glue prompt written notice thereof <br />to the Archie^ct. <br />2.4 The Owner shad furnish information required of him <br />as espeditious!y ..s necessary for the orderly progress of <br />the l:'ork. <br />ARTICLE 3 <br />CONSTRUC.TiON COST <br />3.1 If the Construction Cast is to 6e used as the basis <br />for determining the Architect's Compensation for Sasic <br />Services, i; shall be the tutu( cast or esYmated Cost to <br />the Uwner o' a!I Work designed or specified by the <br />Architect. The Construction Cost shall be determined as <br />follows, with precedence in the order listed' <br />3.t.7 Fer comp;reed construction, the cost of all such <br />Work, including coos of managing construction; <br />3.7.2 For Work not constructed, tt) the lowest bona fide <br />bid received from a qualified bidder for any or ail pf such <br />Work, or (z) if the Work is not bid, the bona fide nego- <br />:;ated proposal submitted for any or all of such Wprk; or <br />3.7.3 For \work for which no such bid or proposal is <br />received, ?') the latest Detailed Estimate of Consuuctipn <br />Cost if ene is availab'e, er Q) the latest Statement of <br />Probable Cnnstruc:Ian Cust. <br />3.2 Construction Cost does not include the compensa- <br />tion of the Architect one! his consultants, the cost of the <br />;and, rights-uf-way, or other costs which. are the responsi- <br />hi!ity of the Owner as provided in ?aragraphi 2.3 through <br />2.G inclusive. <br />3.3 The cost of la`+or, materials and cqu~pment furnished <br />by the U,vr,er for the Project shat! be included in the <br />Construction Cost at current market rates including a <br />reuonaisle allowance for overhead and profit. <br />3.a Statements of Probab:e Construction Cost and fle- <br />ta:;ed Cost Fst~mates prepared by the Architect represent <br />his best jur'gment as a design professional familiar with <br />the costruct:;m industry. i; is recognized, however, that <br />nr.ther t`~e Arc`,itet't nor the Owner has any conirot over <br />the cos: of lahur, ma•~ri; rs o. equipment, over the con- <br />'ra~•o~,- mr•~hor?s t,f .^'everm:ning bid prices, or over com- <br />~e'~':ve h:cc•n;; or r-t~rKe: tondrtionz- Accordingly, the <br />A!A UK3CUME.~`7 Brat CSiV\FR-ARCttt?'r~T AC;::E E.+?E\' • jA\'_'ACY !".. .;;i` A'A=~' t;,'. J7< <br />.n' Avt!tilCA': ir:STt7tttr {)r ,12CI n7EC ts. 7'S; vr'.v Y(yRK At-r., '~.s{,•.. 1'..4,'"\!.'t ~\, J.C. 2tx~OG <br /> <br /> <br /> <br />