Laserfiche WebLink
20090838:x. <br />Commencing at the northwest corner ofthe North Halfofthe Northeast Quarter <br />(N 1 /2, NE 1 /4) Section Twenty Four (24), Township Eleven (11) North, Range <br />Ten (10) West of the 6th PM, Hall County, Nebraska; thence easterly along the <br />northerly line of said North Half of the Northeast Quarter (N1/2, NE1/4) Sectian <br />Twenty Four (24), a distance of six hundred seventy three and four tenths (673.4) <br />feet; thence S00°S7'S2"E along the easterly line of a tract of land described in <br />Dacurnent 200709866 recorded in the Register of Deeds Office, Hall County, <br />Nebraska, a distance of one hundred forty nine (149.0) feet to the ACTUAL Point <br />of Beginning; thence continuing S00°S7'S2"E along the easterly line of said tract <br />of land described in Document 200709866, a distance of one thousand sixty seven <br />and five hundredths (1,067.OS) feet to a point on a northerly right-of way line of <br />U.S. Highway 30; thence S41 °21' 18"W along a said northerly right-of--way line of <br />U.S. Highway 30, a distance of twenty nine and seventy one hundredths (29.71) <br />feet; thence N00°57'S2"W, a distance of five hundred seventy one and seventy <br />seven hundredths (571.77) feet; thence N89°28'31"E, a distance aftwelve (12.0) <br />feet; thence N00°S7'S2"W, a distance of five hundred seventeen and forty <br />hundredths (S 17.40) feet to a point on the southerly line of an existing twenty <br />(20.0) foot wide easement as described in Document 200900899 recorded in the <br />Register of Deeds Office, Hall County, Nebraska; thence N89°28'31"E along the <br />said southerly line of an existing twenty (20.0) foot wide easement described in <br />Document 200900899, a distance of eight (8.0) feet to the said Point of Beginning. <br />The above-described easement and right-of--way containing a total of 0.352 acres, <br />more or less, as shown on the plat dated 9/24/2009, marked Exhibit "A", attached <br />hereto and incorporated herein by reference, <br />together with the following rights: <br />Grantee shall have unrestricted ingress and egress to the above-described easement and <br />right-of--way for any purpose necessary for the surveying, construction, inspection, maintenance, <br />repair, replacement, relocation, extension, removal, and operation of such public utilities and <br />appurtenances. Such rights of ingress and egress shall be exercised in a reasonable manner. <br />Grantee shall have the right to excavate and refill ditches and trenches necessary for such <br />public utilities and appurtenances; to place electrical line anchors and/or anchors with guy wires <br />attached thereto on Grantor's property; to remove, clear, and keep clear, trees, bushes, hedges, <br />undergrowth, and/or any other obstructions interfering with the surveying, construction, <br />-2- <br />