Laserfiche WebLink
~, ~ ,..~ <br />.- <br />20090590' <br />Easel 2 to Exhibit "C" <br />~~ <br />INTLr'IolNAYIpt.1AM, INC. <br />December 31, 2006 <br />To: U.S. Army Tank-Automotive & Armaments Command <br />1 Rock Island Arsenal <br />Rock Island, IL 61299-6000 <br />Subiect: 5X Certification of Buitdin~s within Load Line 4 at Cornhusker Army <br />Ammunition Plant, Grand Island, Nebraska <br />According to the U.S. Army Pamphlet IQCP 385-1, the 5X level of contamination exists <br />when "no significant amounts (not enough to present an explosive safety hazard) of <br />contamination remain." At the 5X level the "article, equipment, or building" does not pose <br />an explosive safety hazard and is safe for welding, drilling, sawing, etc. and sale to the <br />general public. Therefore, in order for the U.S. Army to transfer the Cornhusker AAP parcel <br />for sale, it must first be classified as 5X. <br />The Load Line 4 area (Section 14, Township 11, Range 11) is located West of Hall County <br />in Grand Island, Nebraska (refer to attached Figures 1 and Z in Appendix A), and previously <br />contained a series of buildings d~lat had been used in the production of explosives and <br />munitions. <br />The explosives decontamination and demolition operations conducted to remove buildings <br />at Load Line 4 area (Buildings 4L-1, 4L-2, 4L-3, 4L-4, 4L-5, 4L-7, 4L-9, 4L-10, 4L-11E, 4L- <br />11W, 4L-12, 4L-14, 4L-17, 4L-18, 4L-19, 4L-20, 4L-Zl, 9L-ZZ, 4L-23, 4L-Z7, 4L-30, CH1$, <br />CH19-1 and CH19-Z) were conducted in accordance with paragraphs 7.1 through 7.9 of the <br />Explosives Safety Submission (ESS) approved by the Department of Defense Explosives <br />Safety Board (DDE56) on June 3Q, 2003. Only aboveground structures and facilities were <br />demolished and removed; this certification letter excludes subsurface inveskigation and <br />removal of underground structures. The LL4 Boiler House (Building 4L-24) is excluded <br />from PIKA's Scope of Work; this certification letter does not apply to the boiler house. <br />The decontamination and demolition procedures resulting in the 5X certification were <br />executed by unexploded ordnance (UXQ) personnel who were former military Explosive <br />Ordnance Disposal (EOD) technicians trained in the recognition, assessment and <br />remediatian of explosive contamination and hazards. <br />Therefore, to the best of our knowledge, the footprint of the buildings, and <br />ramps/walkways associated with LL4 as identified above have been decontaminated to the <br />SX level in accordance with the DDE56-approved ESS. <br />Far PIKA International, Inc: <br />ere' ~~`",r~,".r"~,,.';y,." ..~./,",a:6'i:.w,,.A;. ........-.. I/4, /~~ 4,~~ l,.A"V!.er. ,, .,~-'~..~ <br />Lloyd George Harry Co{eman <br />Senior UXQ Supervisor UXQ Safety/QC Officer <br />12723 Capr~orn Drive, 4`5001 Stafford, Texas 77477 <br />Tel: 281-340-5525 Fax: 281-340-5533 <br />