My WebLink
|
Help
|
About
|
Sign Out
Browse
85006350
LFImages
>
Deeds
>
Deeds By Year
>
1985
>
85006350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:47:08 AM
Creation date
4/1/2008 5:35:35 PM
Metadata
Fields
Template:
DEEDS
Inst Number
85006350
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
" ' 006357 <br />(i) payment of such amounts, if any, as shall be <br />necessary for acquisition of rights -of -way for the <br />purpose of providing access to and from the Project <br />Site, Project Site preparation, clearing or other <br />expenses incident to the improving of the Project Site; <br />(ii) payment for labor, services, materials, and <br />supplies used or furnished in the construction of the <br />Project facilities, payment for the cost of the <br />acquisition of any equipment and the installation <br />thereof in connection w5.th the Project, payment for the <br />cost of the construction, acquisition and installation <br />of utility services or other facilities and all real and <br />personal property deemed necessary in connection with <br />the Project and payment for the miscellaneous expenses <br />incidentaj, to any of the foregoing items; <br />(iii) the cost of performance bonds or other bonds <br />necessary in connection with the acquisition, con- <br />struction, improving and equipping of the Project and <br />any and all types of insurance that may be necessary or <br />appropriate to have in effect during the course of the <br />acquisition, construction, improving and equipping of <br />the Project; <br />(iv) al]. costs of engineering and architectural <br />services, including the costs of test borings, surveys, <br />estimates, plans and specifications and preliminary <br />investigations therefor, feasibility studies in <br />connection with the Project, and for supervising the <br />acquisition, construction, improving and equipping of <br />the Project, as well as for the performance of all other <br />duties required by or consequent to the proper con- <br />structing and equipping of the Project; <br />(v) all expenses incurred in connection with the <br />issuance of the Bonds, including, without limitation, <br />the compensation and expenses of Trustee, feasibility <br />studies, compensation to any financial consultants or <br />underwriters, legal fees and expenses, costs of printing <br />and engraving and all recording and filing fees; <br />(vi) all costs required to be paid under the terms <br />of any contract or contracts for acquisition, <br />construction, improving and equipping of the Project; <br />-4- <br />1W <br />
The URL can be used to link to this page
Your browser does not support the video tag.