Laserfiche WebLink
INSTRUCTIONS: <br />(t) If the lien is claimed by a firm or corporation, state here that affrant is a member of the firm or his <br />official capacity in the corporation. <br />(z) State here whether verbal or written contract. If written, attach copy, or lien is void. <br />(3) "Erection," "Construction," "Alteration," or "Repair," as the case may be. <br />(4) Here insert correct legal description of land. <br />(5) If the labor and material were furnished the contractor and not the owner direct, state "that .................. <br />was the contractor on said building and acting for the owner." <br />(6) If note has been given, say "said amount is further evidenced by a promissory note, a copy of said note <br />being hereto attached and marked `Exhibit B'." <br />M <br />L� <br />j <br />1 C� <br />co r 'z <br />t) V <br />Ln <br />Go <br />t- v i n <br />W <br />} <br />L <br />