Laserfiche WebLink
002832 <br />-2- <br />3. A general description of the materials and labor <br />provided by claimant is as follows: fibreglass shower <br />unit with single lever trim and door; connection for auto - <br />washer off bath; rough -in and install toilet and lavatory; <br />move boiler, pump, pressure tank and water heater; extend <br />Piping; extend drain line and connect same to existing <br />drain line; move existing baseboard; install strip of <br />baseboard in new bath and washer area; copper piping on <br />water and heating lines; PVC plastic pipe on drains and <br />vents. That the amount due for the aforementioned materials <br />is in the sum of Two Thousand and Sixty Dollars ($2,060.00), <br />no part of which amount has been paid. That the last ma- <br />terials and labor were furnished to the aforesaid property <br />on May 20, 1985. <br />SANITARY PLUMBING COMPANY, <br />INC., Claimant: <br />Donald L. Kell <br />u <br />� L <br />J <br />X <br />J <br />