Laserfiche WebLink
INSTRUCTIONS: <br />(1) 11 the lien is claimed by a firm or corporation, state here that afiiaxt is a member of the firm or his, <br />official capacity in the corporation. <br />(a) State here whether verbal or written contract. If written, attach copy, or lien is void. <br />(3) "Erection," "Construction," "Alteration," or "Repair" as the case may be. <br />(q) Here insert correct legal description of land. <br />(s) 11 the labor and material were furnished the contractor and not the owner direct, state "that ............. <br />was the contractor on said building and acting for the owner." <br />(6) If sate has been given, say "said amount is further evidenced by promissory note, a copy of said xole <br />being hereto atteehed and marked `Exhibit B'," <br />NJ <br />LO <br />Z <br />GO <br />O <br />C <br />r <br />C C Et, <br />C <br />1 <br />Go <br />C3 <br />tr,� <br />C13 C.> <br />t <br />NJ <br />