Laserfiche WebLink
114 94 <br />j.05 <br />ADDEKDUM <br />Grantor shall not be liable to Grantee for accidental dome$* to <br />Grantee's cable or other facilities resulting from the operation <br />of farm machinery within the easement area in the course of normal <br />farming operations. <br />Grantor also shall not be liable to Grantee for accidental damage <br />to Grantee's cable or other facilities occurring in the course of <br />excavating or digging in or about the easement area, provided that <br />Grantor has done all of the following: (a) notified Grantee at <br />least one (1) working day prior to excavating or digging within <br />5 feet of the permanent easement strip; (b) permitted Grantee's <br />representative to enter Grantor's lands to locate the cable or <br />other facilities, and permitted Grantee's representative to be <br />present during the digging and excavation, and (c) has avoided <br />excavating or digging directly where Grantee's representative has <br />identified the cable or other facilities to be located, or, if <br />that is not feasible, followed Grantee's representative's reason- <br />able suggestions (such as hand excavation) to avoid damage to the <br />cable or other facilities. The notice required under (a) above <br />may be given directly to Grantee by calling Grantee (toll -free or <br />collect) at (800) 328 -6039 or such other replacement number <br />provided by Grantee to Grantor. <br />Grantee agrees to bury said cable a minimum depth of 48 inches. <br />Grantee agrees to pay for damages to fences and growing crops <br />arising from the construction and installation of said cable, and <br />future maintenance of aforesaid systems. <br />Grantee agrees not to construct above - ground line or structures <br />upon said easement strip except for markers at fence lines, <br />property lines, and ditch banks. <br />Grantor reserves the right to cross said easement with roads, drive - <br />ways, field tile and other utilities, including water, electricity, <br />gas, and sewer lines subject; however, to the following: (a) Grantor <br />and its agents and contractors shall at all times exercise reasonable <br />care to prevent damage to Grantee's cable or other facilities, and <br />(b) Grantor shall give Grantee not less than one day's notice prior <br />to engaging in any construction activities within five feet of the <br />easement. <br />If, in connection with Grantor's intended installation of new <br />drainage tile, ditches, water lines or sewer lines, it is necessary <br />that the placement of Grantee's cable or other facilities be lowered <br />in order to maintain a proper fall for drainage, then, upon 90 days <br />prior notice, Grantee shall commence such lowering at Grantee's <br />expense and shall complete same with reasonable diligence. <br />r' <br />Signed for Identification <br />x <br />�.f <br />#;' <br />