Laserfiche WebLink
200'708365 <br />appropriate explosive ordnance disposal personnel can be dispatched to address such MEC as <br />required under applicable law and regulations. <br />4. Easement and Access Rights. <br />(a) The Grantor reserves a perpetual and assignable right of access on, over, and <br />through the Property, to access and enter upon the Property in any case in which a munitions <br />response action is found to be necessary, or such access and entrance is necessary to carry out a <br />munitions response action on adjoining property. Such easement and right of access includes, <br />without limitation, the right to perform any additional investigation, sampling, testing, test - <br />pitting, surface and subsurface clearance operations, or any other munitions response action <br />necessary for the United States to meet its responsibilities under applicable laws and as provided <br />for in this Deed. This right of access shall be binding on the Grantee, its successors and assigns, <br />and shall run with the land. <br />(b) In exercising this easement and right of access, the Grantor shall give the <br />Grantee or the then record owner, reasonable notice of the intent to enter on the Property, except <br />in emergency situations. Grantor shall use reasonable means, without significant additional cost <br />to the Grantor, to avoid and/or minimize interference with the Grantee's and the Grantee's <br />successors' and assigns' quiet enjoyment of the Property. Such easement and right of access <br />includes the right to obtain and use utility services, including water, gas, electricity, sewer, and <br />communications services available on the property at a reasonable charge to the United States. <br />Excluding the reasonable charges for such utility services, no fee, charge, or compensation will <br />be due the grantee nor its successors and assigns, for the exercise of the easement and right of <br />access hereby retained and reserved by the United States. <br />(c) Neither the Grantee nor its successors and assigns, as the case may be, shall <br />have any claim at law or equity against the United States or any officer, employee, agent, <br />contractor of any tier, or servant of the United States based on actions taken by the United States <br />or its officers, employees, agents, contractors of any tier, or servants pursuant to and in <br />accordance with this Paragraph. In addition, the Grantee, its successors and assigns, shall not <br />interfere with any munitions response action conducted by the Grantor on the Property. <br />5. The Grantee acknowledges receipt of the Statement of MEC Removal, which <br />includes the 5X certificates applicable to this property. The Grantee also acknowledges that it <br />has been provided access to complete Load Line 1 MEC removal reports, including the <br />2004 Final Report 5X Certification of Load Line 1 (MKM Engineers, Inc.) and the 2007 Final <br />Report 5X Certification at Load Lines 1 and 2, Asbestos - Containing Material Removal Project <br />(URS Corporation), through the site repository located at 102 North 60th Road, Grand Island, <br />Nebraska. <br />V. GENERAL EXCEPTIONS TO CONVEYANCE <br />This conveyance is expressly made subject to the following matters to the extent and only <br />to the extent the same are valid and affect the property: <br />10 <br />