My WebLink
|
Help
|
About
|
Sign Out
Browse
200305112
LFImages
>
Deeds
>
Deeds By Year
>
2003
>
200305112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2011 9:20:44 PM
Creation date
10/21/2005 5:12:46 PM
Metadata
Fields
Template:
DEEDS
Inst Number
200305112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
200305112 <br />when finally approved by the Regional Planning Commission and the City Council to be <br />acknowledged by such owner, certified as to accuracy of survey by a registered land surveyor, and to <br />contain a dedication of the easements to the use and benefit of public utilities, and of the street to the <br />use of the public forever. In consideration of the acceptance of the plat of said PFEIFENHOF <br />SCHUETT SUBDIVISION, the Subdivider hereby consents and agrees with the City of Grand <br />Island, Nebraska, that it will install or provide at its expense the following improvements: <br />1. Paving. The Subdivider agrees to waive the right to object to the creation of <br />any paving or repaving district for Airport Road where it abuts the subdivision. <br />2. Water. Public water supply is not available to the subdivision. Therefore, <br />individual water well systems shall be permissible on an initial basis. The Subdivider waives the <br />right to protest the creation of any future water district within or abutting the subdivision. Any <br />easements shall be kept free of obstructions and the Subdivider shall indemnify the City for any <br />removal or repair costs caused by any obstructions. Lot One (1) must be connected to such water <br />district within two (2) years of district completion. <br />3. Sanitary Sewer. Public sanitary sewer main is not available to the <br />subdivision; therefore individual systems shall be permissible on an initial basis. However, the <br />Subdivider waives the right to protest the creation of a sanitary sewer district within or abutting the <br />subdivision. Lot One (1) must be connected to such sewer district within two (2) years of district <br />completion. <br />4. Storm Drainage. The Subdivider agrees to grade all lots in the subdivision in <br />conjunction with the development proposed thereon so that storm drainage is conveyed to a public <br />right -of -way or to other drainage systems so approved by the Director of Public Works. <br />-2- <br />r <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.