Laserfiche WebLink
. � <br /> � ,� ., <br /> 39 �080 �.7 <br /> TABIE 1 <br /> CORNHUSKER ARMY AMMUNITION PLANT <br /> DoD Environmental Condition Categories <br /> Area Condition Hazardous Substance Rationale for Designation <br /> Category and Petroleum Product <br /> Number Storage,Release,or <br /> Disposal Notification <br /> Natural Gas Pipe Line 4 TNT, Metals(Cadmium(Cd), All removal or remedial action has been taken. <br /> Load Line 1 Chromium(Cr)and <br /> - Lead(Pb),petroleum, <br /> polychlorinated biphenyls(PAH), <br /> toluene <br /> Natural Gas Pipe Line 4 TNT, Metals(Cadmium(Cd), All removal or remedial action has been taken <br /> Load Une 2 Chromium(Cr)and <br /> Lead(Pb),petroleum, <br /> polychlorinated biphenyls(PAH), <br /> toluene <br /> Natural Gas Pipe Line 4 TNT, Metals(Cadmium(Cd), All removal or remedial action has been taken <br /> Load Line 3 Chromium(Cr)and <br /> Lead(Pb),petroleum, <br /> polychlorinated biphenyls(PAH), <br /> toluene <br /> Natural Gas Pipe Line 4 TNT, Metais(Cadmium(Cd), Ail removal or remedial action has been taken <br /> Load Line 4 Chromium(Cr)and <br /> Lead(Pb),petroleum, <br /> polychlorinated biphenyls(PAH), <br /> toluene <br /> Naturai Gas Pipe Line 4 TNT, Metals(Cadmium(Cd), All removal or remedial adion has been taken <br /> Load Line 5 Chromium(Cr)and <br /> Lead(Pb),petroleum, <br /> poiychlorinated biphenyls(PAH), <br /> toluene <br /> Natural Gas Pipe Line 4 TNT, Metals(Cadmium(Cd), AII removai or remedial action has been taken <br /> Shop Area Chromium(Cr)and <br /> Lead(Pb),petroleum, <br /> polychiorinated biphenyls(PAH), <br /> toluene <br /> Natural Gas Pipe Line 4 Metals(Cadmium(Cd), All removal or remedial action has been taken <br /> NiVate Area Chromium(Cr)and <br /> Lead(Pb),polychlorinated <br /> biphenyls(PAH),and toluene <br /> Open areas where 1 No known contaminates All removai or remedial action has been taken <br /> natural gas line runs <br /> Plume 6 RDX/HMX Interim action OU1 ROD was signed Nov 94, <br /> Waste Water Pump and Treatment Plant <br /> became operational as of 18 December 1998. <br /> ' FIGURE 9 <br />